Laserfiche WebLink
Gunnison River Subbasin <br /> Tomichi Creek at Gunnison <br /> Gunnison River at Gunnison <br /> Gunnison River below Gunnison Tunnel <br /> Gunnison River at Delta <br /> North Fork near Hotchkiss <br /> Uncompahgre River at Colona <br /> Gunnison River near Grand Junction <br />San Juan/Dolores/San Miguel Subbasins <br /> San Juan River at Navajo Reservoir <br /> Piedra River at Arboles <br /> Los Pinos River at Boca <br /> Animas River at State Line <br /> La Plata River at State Line <br /> Mancos River at Towaoc <br /> Dolores River near Dolores <br /> Dolores River near Bedrock <br /> Sa n Miguel near Placer <br /> San Miguel River near Uravan <br />Yampa/White /Green Subbasins <br /> Yampa River near Steamboat Springs <br /> Yampa River below Elk River <br /> Yampa River below Craig <br /> Yampa River above Green River <br /> White River above Meeker <br /> White River near State Line <br /> Green Ri ver above Yampa River <br />Also to be prepared is a memo containing a review of the generation of CDSS <br />th <br />hydrology in the early part of the 20 century and its appropriateness of use of <br />that hydrology in water availability studies for the Colorado River. Review will <br />address inclusion of periods of critical hydrology. <br /> <br />b. These summaries will be distributed (along with references to much more <br />detailed documentation on State web site) to basin roundtable members for <br />the discussion/validation of the State m odel s . Ea ch r oundtable m ember <br />will be requested to review (within a n eight week period) the summary <br />(and extended documentation of the model , if appropriate) for reasonable <br />operation of the current hydrologic base/ demands and offer suggestions <br />and comments as appro priate. <br /> <br />c. The study management team will r eview r oundtable member <br />suggestions/comments and prepare responses to each suggestion/comment <br />of the Roundtable members. Distribute the study team responses (by <br />subbasin) back to Roundtable members for further com ment. The study <br />management team will revise study documents as appropriate to include <br />these comments. <br /> <br />d. CDSS Model Workshop s - Prepare three workshop s for all interested BRT <br />members and others in which the study team will present information on <br />current impl ementation of the CDSS water allocation models for the <br />Colorado River Subbasins and refinements suggested by the BRT <br />Colorado River Water Availability Study Scope 9 October 1 9 , 2007 <br />