My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRWaterAvailabilityScope - Final Phase I Scope
CWCB
>
Interbasin Compact Committee
>
DayForward
>
CRWaterAvailabilityScope - Final Phase I Scope
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 11:53:43 AM
Creation date
11/6/2007 4:17:58 PM
Metadata
Fields
Template:
Interbasin Compact Committee
Title
Water Availability Study of Colorado River and Tributaries Phase 1 Scope of Work
Date
10/19/2007
Author
CWCB
Interbasin CC - Doc Type
General Resources
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Gunnison River Subbasin <br /> Tomichi Creek at Gunnison <br /> Gunnison River at Gunnison <br /> Gunnison River below Gunnison Tunnel <br /> Gunnison River at Delta <br /> North Fork near Hotchkiss <br /> Uncompahgre River at Colona <br /> Gunnison River near Grand Junction <br />San Juan/Dolores/San Miguel Subbasins <br /> San Juan River at Navajo Reservoir <br /> Piedra River at Arboles <br /> Los Pinos River at Boca <br /> Animas River at State Line <br /> La Plata River at State Line <br /> Mancos River at Towaoc <br /> Dolores River near Dolores <br /> Dolores River near Bedrock <br /> Sa n Miguel near Placer <br /> San Miguel River near Uravan <br />Yampa/White /Green Subbasins <br /> Yampa River near Steamboat Springs <br /> Yampa River below Elk River <br /> Yampa River below Craig <br /> Yampa River above Green River <br /> White River above Meeker <br /> White River near State Line <br /> Green Ri ver above Yampa River <br />Also to be prepared is a memo containing a review of the generation of CDSS <br />th <br />hydrology in the early part of the 20 century and its appropriateness of use of <br />that hydrology in water availability studies for the Colorado River. Review will <br />address inclusion of periods of critical hydrology. <br /> <br />b. These summaries will be distributed (along with references to much more <br />detailed documentation on State web site) to basin roundtable members for <br />the discussion/validation of the State m odel s . Ea ch r oundtable m ember <br />will be requested to review (within a n eight week period) the summary <br />(and extended documentation of the model , if appropriate) for reasonable <br />operation of the current hydrologic base/ demands and offer suggestions <br />and comments as appro priate. <br /> <br />c. The study management team will r eview r oundtable member <br />suggestions/comments and prepare responses to each suggestion/comment <br />of the Roundtable members. Distribute the study team responses (by <br />subbasin) back to Roundtable members for further com ment. The study <br />management team will revise study documents as appropriate to include <br />these comments. <br /> <br />d. CDSS Model Workshop s - Prepare three workshop s for all interested BRT <br />members and others in which the study team will present information on <br />current impl ementation of the CDSS water allocation models for the <br />Colorado River Subbasins and refinements suggested by the BRT <br />Colorado River Water Availability Study Scope 9 October 1 9 , 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.