My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10502 (2)
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10502 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:31 AM
Creation date
11/1/2007 11:35:04 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
State of Colorado - 2007 Flood Documentation Reports
Date
8/1/2007
Prepared For
CWCB
Prepared By
ICON Engineering
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Additional Supnort Information <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />.. <br />. . <br />. \t <br />,~-.. <br /> <br />I <br /> <br />Figure 1.9 - Looking towards failure in earthen <br />embankment. The embankment section for a <br />length of approximately 200 feet was washed <br />away. Note that the flows in Fountain Creek <br />did not overtop the embankment, but rather <br />the failure was likely caused by the eroding <br />away of the toe of the embankment. <br /> <br />I <br /> <br />I <br /> <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Figure 1.11 - Fountain Creek flood waters at <br />lower breach (Dickey Property). <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />ICON E~gil'1eerirg. Inc: <br /> <br /> <br />;...__ .... _7" <br /> <br />. <br /> <br />Figure 1.10 - South end of the remaining <br />earthen embankment. Approx. dimensions <br />are: 20.25 feet top width, 3:1 side-slopes and <br />10 feet in height. Note the horizontal layering <br />of soil placement in the embankment. <br /> <br /> <br />Figure 1.12 - Placement of fill material to build <br />temporary embankment closure. Note that <br />new embankment is placed east of old earthen <br />embankment to allow future re-construction of <br />breached embankment. <br /> <br />9 <br /> <br />May 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.