Laserfiche WebLink
<br />· Summary of hydraulic information, models, parameters, and explanation of all <br />assumptions. <br /> <br />12. A full explanation of differences between the results of this study and the <br />previous NRCS study. <br /> <br />13. Copies of all plan and profile sheets in 11" x 17" format. Plotted sheets <br />shall be of high quality so that Xerox copies can be made that are legible <br />and easy to read. An index to the plan sheets shall also bE~ provided. <br /> <br />14. A list of references used for the study. <br /> <br />1.03 COMPLETION OF WORK <br /> <br />The ENGINEER shall complete the work as assigned in the Scope of V\fork and submit <br />the draft reports no later than 40 calendar days after the Notice to Proceed has been <br />issued by the CITY. The CITY and the CWCS shall have 30 calendar days to review <br />the draft report and provide written comments to the ENGINEER. During the review <br />period, the ENGINEER should be prepared to make a brief presentation and answer <br />questions during a City Council and/or public meeting. The ENGINEER shall complete <br />and deliver the final report and submittals to the CIITY within 15 calendar days of receipt <br />of written review comments. <br /> <br />A-4 <br />