Laserfiche WebLink
<br />'I <br />'I <br />........ ~ <br />-II <br /> <br />;-- <br /> <br />Fourmile Creek Floodplain Delineation Study <br />City of Canon City <br />Engineering Cost Estimate <br />August 199:B <br />Item Hours Rate. Cost <br />1. Kick-off meeting 4 $145 $580 <br />2. Review existing study and models 6 $65 $390' <br />3. Incorporate new topo mapping into base map 8 $50 $400 <br /> ~~.~ <br />3. Field investigations and map check 8 $65 $520 <br />4. Revise NRCS HEC-2 model 24 $65 $1,560 <br />5. Veryify/revise basic hydraulic assumptions 8 $65 $520 <br />6. Analyze Mud Gulch, split flow potential 12 $65 $780 <br />6. Perform floodway analysis for lower reach 10 $65 $650 <br />7. Delineate revised floodplain and floodway 8 $65 $520 <br />8. Revise flood profiles (10,25,50,100,500) 15 $65 $975 <br />9. Create final plan and profile sheets 12 $50 $600 <br />10. Generate floodplain report text 18 $65 $1,170 <br />11. Generate report graphics and figures 12 $50 $600 <br />12. Coordinate with CWCS staff 6 $65 $390 <br />12. Publish 2 copies of draft report for review Direct $200 $150 <br />13. Progress meeting 4 $145 $580 <br />14. Attend public meeting 4 $145 $580 <br />15. Address review comments 8 $65 $520 <br />16. Publish 10 copies of final report Direct $800 $500 <br />Total Hours 167 <br />~ Total Engineering Cost $11,985 <br /> ~~~ -- <br />· Rate = assumed consultant hourly rate <br /> ----.- <br /> -- <br /> PRELIMINARY <br /> =-===t <br /> <br />fourmile study cost <br /> <br />8/19/98 4: 11 PM <br />