Laserfiche WebLink
<br />b. Cross sections 103.1 through 103.5 are not part of this contract. <br /> <br />c. Two cross sections are identified at each diversion structure, one upstream and one <br />downstream of the structure. These cross sections can be replaced with a single cross section <br />at the structure at the POC's discretion. Only one section is shown at cross section 76. where <br />it appears either an abandoned bridge or a partial bridge exists. <br />