My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10392
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10392
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:10 AM
Creation date
10/29/2007 3:46:46 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Weld
Stream Name
South Platte River
Basin
South Platte
Title
Aerotriangulation Report - Lower South Platte River Mapping Project
Prepared For
CWCB
Prepared By
Kucera International, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />be sent to <br />telephoned to <br /> <br />at the address shown below. Changes to the schedule can be <br />at <br /> <br />POC <br />Address <br />Telephone <br />Etc. <br /> <br />b. Review: A 95 percent review of the collected and processed data will be completed <br />by the Omaha District, or other contracting agency. The contractor shall submit to the above <br />address a floppy disk with the data in the format specified in this scope of work. The data will <br />be checked for errors/anomalies within 10 working days of submission and the contractor will be <br />notified by phone and/or in Writh"lg of necessary corrections/adjustments. The contractor shall <br />make all necessary corrections/adjustments before delivering the fInal product. No extra cost <br />shall be included by the contractor for the review. <br /> <br />8. Completion of Work: Completion of work shall include acceptable performance of the work <br />described above and the delivery of the following items: <br /> <br />a. ffiM compatible 3-112" floppy disk(s) with the cross section data stored in the ASCII <br />format described above. <br /> <br />b. All preliminary graphs, charts, data sheets, and fIeld books necessary to complete the <br /> <br />work. <br /> <br />c. The return of any and all non-expendable items. <br /> <br />9. Attachments: The following items are attached to this scope of work. <br /> <br />a. Location map of the survey area and the locations of the control monuments. Are <br />control monument locations for the aerial photography available? <br /> <br />b. Horizontal and vertical control sheets for the monuments in the survey area. Is <br />horizontal and vertical control for the aerial photography available? <br /> <br />c. An example of the required data format (X-Y-Z) for use by the contractor is attached. <br /> <br />d. Aerial photographs with the cross sections identified and located. <br /> <br />10. Miscellaneous: <br /> <br />a. Aerial photography flights 13. 16, 18, and 20 do not contain any cross section data. <br />
The URL can be used to link to this page
Your browser does not support the video tag.