Laserfiche WebLink
<br /> <br /> <br />streets <br />design, along with the use of stormwater <br /> <br />pipes, <br /> <br />would convey the maximum flow possible <br /> <br />within them <br /> <br />a number <br />These streets <br /> <br />would include Furry <br /> <br />street <br />Gordon and the Hale Street <br /> <br />crowns <br />Alley <br /> <br />This configuration of street <br /> <br />expense <br />construct <br /> <br />of smaller channels <br /> <br />Modifications to the master plan included the following <br />along Gordon would be eliminated. <br /> <br />water east <br /> <br />items <br />The Town feels <br />also w0uld~beanuisance and created undesirableuproblems <br />inverted <br /> <br />in the form of <br /> <br />City <br /> <br />First, the major channel conducting storm <br />that this type of structure, besides its large <br />In <br /> <br />in place theo <br />along the easternmost <br /> <br />Town would <br /> <br />to make <br /> <br />In order to facilitate <br />it <br /> <br />affordable <br /> <br />the conclusion of this <br />within the's <br /> <br />City <br /> <br />available resources <br /> <br />master plan, the decision was made <br /> <br />to modify <br /> <br />the proposed plan <br /> <br />The conclusions of the master plan were considered useful. The master plan outlined a means <br />and convey effectively the storm water generated by a 2-year design storm. The cost <br />with the master plan (approximately $5 million) <br /> <br />was considered prohibitively expensive <br /> <br />to control <br />estimate associated <br /> <br />however. <br /> <br />~ ...I"":n"(Y-;: basins, <br /> <br />is used. Because <br />and development that <br />a higher recurrence interval <br /> <br />interval <br /> <br />interval for design storms <br /> <br />Attendees for the meeting were Mark Brown, Superintendent, <br />City of Holyoke City of Holyoke; <br />MWE <br /> <br />and Ron McLaughlin, <br /> <br />Steve Brown, City Council <br /> <br />Tom Browning, CWCB <br />initially discussed the findings of the drainage <br /> <br />City of Holyoke <br /> <br />Ron Miles <br /> <br />master plan with <br /> <br />John T. Kaufman, <br /> <br />City Council, <br /> <br />RE <br /> <br />TO <br /> <br /> <br />FROM <br /> <br />Meeting on December 13, 1999 for the Holyoke Drainage Master Plan <br /> <br />John T. Kaufman, <br /> <br />Design File: 95-026.011; Ron C. McLaughlin <br />CWCB; Mark Brown, City of Holyoke <br />~~ <br />M\VE <br /> <br />MEMORANDUM <br />December 21, 1999 <br /> <br />(MWE) <br /> <br />Tom Browning <br /> <br />.. <br /> <br /> <br />Mc~ughlin <br /> <br />-.- <br /> <br />Water <br /> <br />engineers, I td, <br /> <br /> <br />/.~f'Jf'--" " <br />'<--;......-. -. ~: <br />" ' <br />.... ..._ow--- <br /> <br />0~"'">:l <br />\ .j" <br />'..d.,~0 <br /> <br />rr'~ ,/ ~,- <br />\; ~~,-;"'- <br /> <br />. <br />/ <br /> <br />" <br />>' <br /> <br />.~0C'\ <br />\~~j~ <br />