My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12522
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:39 PM
Creation date
10/21/2007 10:48:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
12/15/1997
Author
DOI-GCMRC
Title
Draft Fiscal Year 1999 - Annual Monitoring and Research Plan - Grand Canyon Monitoring and Research Center - 12-15-97
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,', " ". I. 6 <br />UUw~i.."1 <br /> <br />4 <br /> <br />GCP A. General strategies outlined in the Strategic Plan must be made more definitive by <br /> <br />drafting specific monitoring and research proposals to be implemented within a given year or <br /> <br />across several years of the Strategic Plan. <br /> <br />The GCMRC's FY 99 Annual Plan describes individual monitoring and research projects <br /> <br />that will be initiated in response to objectives and information needs identified annually by the <br /> <br />stakeholders and outlined in general terms in the Strategic Plan. It is anticipated that the Strategic <br /> <br />Plan will be revised following review by the AMWG and the National Research Council in FY <br /> <br />99/ FY 2000. <br /> <br />As a context for understanding the FY 99 Annual Plan, an overview of the Strategic Plan <br /> <br />and a summary of each major element of the FY 99 Annual Plan is presented below. <br /> <br />AN OVERVIEW OF THE STRATEGIC PLAN: 1998-2002 <br /> <br />The Strategic Plan is designed to implement the adaptive management and ecosystem <br /> <br />science program called for in the GCP A and the GCDEIS. The areas of monitoring, research, <br /> <br />and information technology outlined for physical, biological, cultural, and socioeconomic <br /> <br />resources are to be implemented over a five-year period. Annual program plans are developed <br /> <br />to assure appropriate progress on critical elements of the Strategic Plan. In response to the nature <br /> <br />of the Adaptive Management program, the Strategic Plan may need to be modified in less than <br /> <br />five years. <br /> <br />All elements of the Strategic Plan, and all monitoring programs, research projects, and <br /> <br />information technologies drafted into annual program plans, have been developed in response to <br /> <br />management objectives and information needs specified by the AMWG. <br /> <br />Final Draft - (12/15/97) For AMWG Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.