Laserfiche WebLink
<br /> <br />002172 <br /> <br />30 <br />This program will take place over FY 98 and FY 99 with progress reports due following <br /> <br />the scoping meeting and each workshop. The scoping meeting for the river ecosystem is <br /> <br />scheduled for January 1998, with the first workshop tentatively scheduled for March 1998 and <br /> <br />the second workshop scheduled for September 1998. A draft final report on the river model is <br /> <br /> <br />due in FY 99 on 15 December 1998, and a final report is due on March 31, 1999. The final <br /> <br /> <br />report will contain an executive summary, suitable for dissemination to management entities. <br /> <br /> <br />Upon completion, the conceptual model will be delivered to the GCMRC in appropriate <br /> <br />electronic format and with suitable documentation to allow GCMRC managers to operate and <br /> <br />further develop the model. <br /> <br />Final Draft - (12/15/97) For AMWG Review <br />