My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12502 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12502 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:36 PM
Creation date
10/21/2007 8:35:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
6/10/1998
Author
Unknown
Title
Glen Canyon Dam Management Objectives - Draft - 06-10-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003551 <br /> <br />2 <br /> <br />The Glen Canyop. Dam Final Environmental Impact Statement states that an Adaptive <br />Management Program (AMP) will be initiated following the issuance of a Record of Decision by <br />the Secretary of the Interior. The concept of adaptive management is based on the recognized <br />need for operational flexibility to respond to future monitoring and research findings and varying <br />resource conditions. The AMP will monitor the effect of the operating criteria adopted by the <br />Secretary pursuant to the Grand Canyon Protection Act of 1992 (GCPA) and determine if the <br />anticipated results (Management Objectives) in the Preferred Alternative of the Environmental <br />Impact Statement and the Record of Decision are being reached. If it is found that the objectives <br />are not being reached, the AMP will develop proposals for modifying to the Glen Canyon Dam <br />Operations, modifying the Management Objectives, and/or the exercise of other authorities <br />under existing laws to achieve the anticipated results (Management Objectives). <br /> <br />Principles which guided the design of the Adaptive Management Program (AMP) include: <br /> <br />1. Monitoring and research programs will be designed by GCMRC in direct response to <br />objectives and information needs of the Adaptive Management Work Group (AMWG). <br /> <br />2. A process is required to coordinate and communicate AMWG information needs to <br />r~searchers and to develop recommendations for decision making. <br /> <br />The AMWG recognized the desirability of beginning the process of clarifying and consolidating <br />the management objectives of organizations that participate in the AMP in order to clearly <br />identify information needs to researchers. Initiating this process facilitates and expedites <br />monitoring and research designs~ <br /> <br />PROCESS <br /> <br />The procedure selected for development and approval of (Stakeholder) Management Objectives <br />and Information Needs is as follows: <br /> <br />Defining Goals. Obiectives and Information Needs. Defining terms were developed by <br />Stakeholders as a guide to articulation of Goals, Objectives, Information Needs and <br />Management Actions as follows: <br /> <br />TERM <br /> <br />DESCRIPTORS <br /> <br />Goals <br /> <br />- Directional Statement <br />- Qualitative <br />- Rarely Attained <br />- Generic <br /> <br />Revised 6-10-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.