My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12502 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12502 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:36 PM
Creation date
10/21/2007 8:35:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Colorado River Water Projects - Glen Canyon Dam-Lake Powell - Adaptive Management
State
CO
Basin
Colorado Mainstem
Date
6/10/1998
Author
Unknown
Title
Glen Canyon Dam Management Objectives - Draft - 06-10-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />uOv549 <br /> <br />DRAFT <br />GLEN CANYON DAM MANAGEMENT OBJECTIVES <br />June 10, 1998 <br /> <br />INTRODUCTION <br /> <br />Initial development of Objectives, Information Needs and Management Actions can and usually <br />does occur by individual stakeholders. However, discussion and agreement on Management <br />Objectives, Information Needs, and Management Actions to be included in the Adaptive: <br />Management Program must occur in an open forum of the Technical Work Group (TWO). Final <br />approval of Management Objectives, Information Needs and Management Actions to be used in <br />developing Grand Canyon Monitoring and Research Center (GCMRC) monitoring and research <br />plans is by the Adaptive Man~gement Work Group (AMWG). <br /> <br />PURPOSE <br /> <br />The purpose for developing Management Objectives is to define measurable standards of desired <br />future resource conditions which will serve as objectives to be achieved by all stakeholders in <br />the Glen Canyon Dam Adaptive Management process. These Management Objectives are <br />framed within the Preferred Alternative and implemented by specific dam operating criteria and <br />other actions taken by the Secretary to protect, mitigate adverse impacts to, and improve the <br />values for which the Glen Canyon National Recreation Area and Grand Canyon National Park <br />were established. <br /> <br />Stakeholder Information Needs define the specific scientific understanding required to obtain <br />specified Management Objectives. These will be reviewed by the National Research Council for <br />FY97 and FY99. <br /> <br />. Management Objectives and Stakeholder Information Needs are the basis for development and <br />implementation of long-term strategic and annual monitoring and research programs. Research <br />plans are developed annually and must address specified Stakeholder Information Needs. <br /> <br />The GCMRC and TWG will report annually on progress related to individual Management <br />Objectives, Information Needs, and Management Actions, and will revise Management <br />Objectives, Information Needs and Management Actions as needed. <br /> <br />BACKGROUND <br /> <br />Revised 6-10-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.