Laserfiche WebLink
<br />41 <br /> <br />'C <br />......1 <br /> <br />~ <br /> <br />tj. <br /> <br />~ <br />( <br /> <br />lJ <br /> <br />t. <br /> <br />.' <br /> <br />(. <br /> <br />" <br /> <br />- 2 - <br /> <br />. <br /> <br />This work plan outlines a three-year project for installation of <br />land treatment and structural measures for the protection of the water- <br />shed. The estimated total project cost is $482,166. The Public Law <br />566 share of this cost will be $431,586. Funds from other sources will <br />be $50,580 and include local funds as well as funds available under <br />other Federal authority. In addition, local organizations will bear <br />the entire cost of operation and maintenance of the structural measures. <br />This is estimated to be $2,387 annua~ly. <br /> <br />Land Treatment Measures' <br /> <br />Approximately 5,735 acres of the upper watershed area is public <br />rangeland under the administration of the U. S. Bureau of Land Management. <br />The cost of proposed land treatment to be applied by the Bureau of Land <br />Management in this area over a two-year period is estimated to be $46,530. <br />The Public Law 566 share will be $40,530, and other funds will amount to <br />$6,000. <br /> <br />Of the 2,490 acres of privately-owned agricultural land, 1,260 <br />acres are irrigated cropland and 1,230 acres are desert rangeland. The <br />cost of proposed land treatment' on these lands over a three-year period <br />is estimated to be $46,600. The Public Law 566 share will be $3,000, <br />and $43,600 ~nll be obtained from other funds. <br /> <br />. <br /> <br />Structural Measures <br /> <br />One floodwater-retarding structure having a total storage capacity <br />of 1,615 acre-feet is proposed on Indian Wash above the area subject to <br />damage. Of the total capacity, 1,045 acre-feet is allotted to floodwater <br />detention and 570 acre-feet to sediment storage. The flooa~ater <br />detention capacity is equivalent to 3 inches of stor.m runoff fram the <br />watershed area controlled and will provide flood protection framstor.ms <br />occurring less frequently than once in a hundred years. The principal <br />spillway flow fram this structure will be carried to the Colorado River <br />through the existing Indian Wash channel. The total cost of the flood- <br />water-retarding structure not including operation and maintenance is <br />estimated to be ~389,036. The average annual cost including operation <br />and maintenance is $16,447. <br /> <br />The sponsors will contract for construction of the floodwater- <br />retarding structure and will furnish personnel and funds for administrnt.ion <br />of the contract. The costs involved in obtaining land, easements, and <br />rights-of-way for the proposed structure will be borne by the sponsors. <br /> <br />. <br />