Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />In addition, containment of water during construction would be needed for the construction of toe protection <br />at scour depth. Historical records of minimum flows along the Arkansas River at Cafton City show a typical <br />low flow depth of about 3 feet across the entire channel width. <br /> <br />The estimates include removal of the existing levee prior to the construction of the soil cement levee, WRC <br />assumed that suitable sandy soil is available nearby for use in the preparation of coil cement (excavated <br />channel bank soil may be suitable). If suitable soil is not available, RCC could be used. Soil cement is laid <br />out in lifts which are poured in-place and compacted. Typical lift heights are 0.5 feet but can vary. The top <br />width of the highest lift should not be less than 8 feet. WRC found that 1 (horizontal) to 1 (vertical) side <br />slopes would fit the base lift between the channel bank and Riverview Drive for the 11,350 cfs flood event. <br />The larger magnitude floods would require slightly steeper slopes in some areas where the distance between <br />the channel bank and the road is more constricted. <br /> <br />WRC evaluated the estimated cost of riprap lined channel/soil cement levee option for three separate flood <br />events of increasing magnitude. Exhibit C shows the extent of improvements required along the south channel <br />bank for flows of 11,350, 12,265, and 13,220 cfs. The 11,350 cfs event corresponds to the magnitude of the <br />flood event that the southern bank could sustain before the weir was constructed assuming the existing levee <br />did not fail. The two larger flows correspond to water levels 0.5 and 1.0 feet higher than the 11,350 cfs <br />flood. Table 3 shows the approximate return periods and estimated costs of improvements for the base case <br />and the three evaluated flows. <br /> <br /> <br />Flow (cfs) <br /> <br />Return Period <br />(yrs) <br /> <br />9 <br /> <br />18 <br /> <br />------2r--- <br /> <br />25 <br /> <br />100 <br /> <br />Levee Height Estimated Cost ($) <br />at Section 2.0 <br /> <br />7000 (base case) <br /> <br />N/A $ 0 <br />4.4 $ 400,000 <br />- 4.9--- - -$"- -499~00(j ------ - <br />5.4 $ 608,000 <br /> <br />~.__._._----_.. ---...--..- -~ -- <br /> <br />11350 <br /> <br />_____u -- '-12265-- -, <br /> <br />13220 <br /> <br />20,500 <br /> <br />* <br />7.4 <br /> <br />* levee height does not include 3-feet of freeboard <br /> <br />6 <br />