Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I~ -I!- <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 4 presents a breakdown of the assumed quantities and costs for the construction of improvements for <br />the three levels of protection. It should be noted that the soil excavation, levee removal, riprap lining, and <br />soil cement quantities are based on the available base mapping. <br /> <br />Another alternative that can be considered by the City is the purchase of an insurance policy that would cover <br />the cost of damage caused by flow in excess of approximately 7,000 cfs (capacity of existing channel without <br />the existing levee) but less than approximately 11,350 cfs (capacity of existing channel with existing levee, <br />before weir construction). To elevate this alternative, it would be necessary to determine the property value <br />within the effected area and the potential damage from the design flow. <br /> <br /> <br />Levee removal cy $ 10 1,616 $ 16,160 1,795 $ 17,950 1,975 $ 19,750 <br />Unclassified excavation cy $ 6 812 $ 4,872 1,079 $ 6,474 1,346 $ 8,076 <br />Tree removal each $ 300 6 $ 1,800 6 $ 1,800 6 $ 1,800 <br />Riprap/bedding cy $ 35 2,445 $ 85,575 3,167 $ 110,845 3,889 $ 136,115 <br />Soil Cement cy $ 60 2,383 $142,987 2,947 $176,832 3,611 $ 216,638 <br />SUBTOTAL $251,394 $ 313,901 $ 382,379 <br /> <br />Survey/Construction % 1.5% $ 3,771 $ 4,709 $ 5,7'36 <br />Testing Materials % 2.5% $ 6,285 $ 7,848 $ 9,559 <br />Dewatering % 20% $ 50,279 $ 62,780 $ 76,476 <br />Mobilization % 5% $ 12,570 $ 15,695 $ 19,119 <br />Engineering % 10% $ 25,139 $ 31,390 $ 38,238 <br />-Coniiiigency- ,- ___ _u__ __% - -~ -20% $ 50,279 $ 02,780 - -$--16:416---' <br />TOTAL COST $399,716 $499,102 $ 607,983 <br /> <br />7 <br />