My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06a
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
06a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:28 PM
Creation date
9/28/2007 1:43:09 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/18/2007
Description
OWCDP Section - Water Efficiency Grant Request from Castle Pines North Metropolitan District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONI <br /> <br />Castle Pines North Metropolitan District <br />Application for Water Efficiency Grant <br /> <br />wire in from the irrigation controllers to the master valve and master meter at each <br />park site. <br /> <br />Deliverables <br />The District plans to begin the installation of this equipment once the Phase I <br />equipment is installed and operational. Section 5.0 provides the preliminary schedule. <br /> <br />Task 3 - Operational Set Up and Initial Monitoring <br /> <br />Purpose <br />This task involves the operational set up of the equipment following installation and <br />developing a protocol for recording monitoring data. <br /> <br />Roles and Responsibilities <br />CAlSENSE and Ewing Irrigation staff would provide the District technical assistance <br />and training in operating the equipment and educating District staff on the central <br />control station's software. It is anticipated that District staff would spend several <br />weeks installing and learning how to operate the system in addition to establishing a <br />monitoring protocol. The District also plans to distribute information to their <br />customers and general public on the Irrigation Management System. Table 4 at the <br />end of this section outlines the specific responsibilities, labor rates, and anticipated <br />level of effort for District staff. <br /> <br />Deliverables <br />The Irrigation Management System would provide detailed metered data of irrigation <br />application rates. District staff would consolidate this data on a monthly basis, <br />recording the monthly amount of irrigated water used at each park. ET and <br />precipitation data would also be collected for data comparison purposes. These data <br />would be used to estimate the amount of District irrigated water saved on an annual <br />basis. The estimated water savings will be presented in the Final Completion Report <br />submitted to the ewCB. The District also plans to develop a Fact Sheet that provides <br />general information on the installation, operation, and overall water saving benefits of <br />the Irrigation Management System. This Fact Sheet will be available to CALSENSE <br />distributors as well as to CWCB for public distribution. The District will also be <br />available for on-site demonstrations for water providers, Parks and Opens Space <br />Managers, and Irrigation Specialists that are interested in learning more about the <br />systems. <br /> <br />5 As indicated in Table 6, the development of the Fact Sheet and water savings estimates for <br />the first year of irrigation is included in the project budget. However, the production of Fact <br />Sheets and on-site product demonstrations are not included. There is too much uncertainty on <br />the number of Fact Sheets needed and tours given to provide a reasonable estimate. <br /> <br />13 <br /> <br />C:lOOCUMENTS AND SETTINGS\8LACKCAlOESKfOPICPNGRANTlWATER EFFICIENCY GRANT PROGRAM AP?l.ICATION.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.