Laserfiche WebLink
<br />Aug-15-01 12:29P TIMOTHY R. <br /> <br />. <br />Mr. James A, Ferentchak, P.E. <br />August 10, 200 I <br /> <br />BUCHANAN <br /> <br />303.3-7266 <br /> <br />P.04 <br /> <br />, . <br /> <br />, <br /> <br />Page 2 <br /> <br />Please submit "As-Constructed" mylar drawings, including the original certification sheet and one set <br />of blueline drawings, upon completion of construction. Final acceptance of the construction will be contingent <br />upon our receipt and acceptance of the "As-Constructed" drawings, as well as the other requicc!'1ents of Rule 10 <br />(copy enclosed) of the Rules and Regulations. It should be noted that as part of the construction completion <br />documents, an updated Emergency Preparedness Plan (EPP) is required, If you have any questions concerning <br />the filing of "As-Constructed" drawings or any other completion document, please contact Mr. Jackson. <br /> <br />We look fOIWard to working with you on this construction project and to achieving a successful <br />completion of the proposed repairs to the dam, <br /> <br />Sincerely, <br /> <br />~~ <br /> <br />Assistant State Engineer <br /> <br />Enclosures: Copies of Rule 9, 10 and 16 of the "Rules and Regulations for Dam Safety and Dam Construction'.. <br /> <br />cc: Dick Stenzel, Division Engineer (w/o enclosures) <br />Garrett Jackson, Dam Safety Engineer (wi approved plans and specifications only) <br />Jim Dubler, Dam Safety Engineer (wi approved plans and specifications only) <br />Edward Fritzler, President, Jackson Lake Reservoir and Irrigation Company (w/o enclosures) <br /> <br />,. <br />