Laserfiche WebLink
<br />. . <br /> <br />TIMOTHY R. <br /> <br />. <br /> <br />BUCHANAN <br /> <br />303-423;-7266 <br /> <br />P.03 <br /> <br />Aug-15-01 12:28P <br /> <br />. <br />STATE OF COLORADO <br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br /> <br />1313 Shefman Street, Room 618 <br />Den""r, Colorado 80203 <br />l't1one: (3031 666.3581 <br />FAX: (303) 866.3589 <br /> <br />"'. <br />M <br />. . <br />. . <br />./816 .. <br /> <br />',;, <br /> <br />httpt/water.state,co.usldefaulr.htm <br /> <br />Bill Owens <br />Governor <br /> <br />August 10, 2001 <br /> <br />AUG'l - <br />J j 2007 <br />J <br /> <br />Greg E. Walcher <br />Executive Director <br />Hal D. Simpson, P.E, <br />State Engineer <br /> <br />Mr, James A. Ferentchak, P.E. <br />W ,W. Wheeler and AssociateS, Inc, <br />3700 South Inca Street <br />Englewood, Colorado 80110 <br /> <br />When replying, please refer to: <br />JACKSON LAKE DAM <br />Construction File Number: C-ISI3 <br />Water Division I, DAMID: 010227 <br /> <br />SUBJECT: <br /> <br />Approval of Plans and Specifications for Construction <br /> <br />Dear Mr, Ferentchak: <br /> <br />Thank you for submitting for review and approval the plans and specifications for construction of the <br />proposed upstream slope protection repair at Jackson Lake Dam. We have completed our review of the <br />documents and have found them to be acceptable for construction. We are transmitting one copy of the <br />construction specifications and under a separate cover, one mylar cover sheet of the construction drawings with <br />approval signatures for the construction of this proposed project. Our acceptance and approval of these <br />documents are effective as of the date of this letter. <br /> <br />The construction plans require the following minor modifications: <br /> <br />. Sheets 2 and 3, Plan View ofthe darn: Please add the locations and horizontal and vertical coordinates <br />of permanent survey benchmarks to be set in the field for construction control. The coordinates should <br />be surveyed to the nearest 0.01 fool. These sheets should also show the locations and elevations (to the <br />nearest 0.0 I foot) of the settlement monuments to be installed on the dam crest. <br /> <br />· Sheet 7, Darn Crest Fill Section (2) has an incorrect reference to Table 5 on Sheet 9. Table 5 is actually <br />on Sheet 11. <br /> <br />These changes can be accomplished on the As-Constructed Drawings and with appropriate addenda to the <br />Bid Documents. There is no need to re-submit the construction plans and specifications at this time. <br /> <br />The construction of this project must be performed under the purview of a professional engineer registered <br />in the State nfColorado. Your attention is directed to Rule 9.A. (copy enclosed) of the Rules and Regulations <br />concerning construction observations, coordination and documentation activities required for this Intermediate <br />size, Class I dam. Please keep Mr. Garrett Jackson of our Pueblo office at (719) 542-3368, extension 118, <br />informed of the construction status so he may also meet his obligations under Rule 9.A. <br />