Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Mr, Edward E, Fritzler, President <br />Jackson Lake Reservoir and Irrigation Co. <br />March 24, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCS Desiqn and Construction Administration Procedures, <br />Tim Feehan will contact you regarding the CWCS requirements conceming design <br />and bidding of the construction project. Tim will make construction inspections, which <br />will be the basis of the monthly pay estimates for disbursement of your loan funds, <br /> <br />d) You must adhere to the CWCS Guidelines for Financial Assistance, A copy of our <br />Guidelines has been provided to your engineer previously, <br /> <br />On behalf of the Soard, I would like to thank you for applying for a water project loan from <br />the Colorado Water Conservation Soard, <br /> <br />Sincerely, <br /> <br />/IjIJ~ <br /> <br />Mike Serlet, P,E" Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Soard <br /> <br />Attachment <br /> <br />Updated Memo: JacksonLakeOlversion1199 memo <br /> <br />cc (wIAttaehment): Mr, Ene Wilkinson, Board Member. Colorado Water Conservation Board <br />'" Jack Odor, P.E,. GASP, 219 E. Railroad Ave.. Fort Morgan, CO 80701 <br />"\ CWCB Section B Staff <br />Undo Bassi, AGO <br />Chrono File <br /> <br />c: wp51\Proj-New\JacksonLakeDiversion300Ltr <br />