Laserfiche WebLink
<br />Mr. Steve Cecil, President <br />Owl Creek Supply and Irrigation Co. <br />February 7, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCS Desiqn and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCS requirements concerning design <br />and bidding of the construction project. Tim will make construction inspections, which <br />will be the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCS Guidelines for Financial Assistance. A copy of our <br />Guidelines has been provided to your engineer previously. <br /> <br />On behalf of the Soard, I would like to thank you for applying for a Construction Fund <br />Loan from the Colorado Water Conservation Soard. <br /> <br />Sincerely, <br /> <br />~ <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Soard <br /> <br />Attachment: <br /> <br />Updated Memo: OwfCreek12000memo <br /> <br />cc (w/Attachment): Mr. William H. Brown, Chair, Colorado Water Conservation Board <br />Duane Smith. P.E.. 1225 Red Cedar Circie, Suite H. Fort Collins, CO 80524 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51lProj.NewlOwlCreek12000Ur <br />