My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00480 (2)
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00480 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2011 9:37:08 AM
Creation date
9/14/2007 1:57:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150015
Contractor Name
Highland Ditch Company
Contract Type
Loan
Water District
5
County
Boulder
Bill Number
HB 98-1189
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />STATE cw: COLORADO <br /> <br />- <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />131 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone: 13031 866-3441 <br />FAX: 0031 866-4474 <br /> <br />MEMORANDUM <br /> <br />Roy Romer <br />Governor <br /> <br />(Updated December 4, 1997) <br /> <br />lames S. lochheild <br />Executive Director, DNR <br /> <br />Oaries C. lile, PE. <br />Director, eWeB <br /> <br />TO: Colorado Water Conservation Board Members <br /> <br />FROM: John Van Sciver <br /> <br />DATE: November 15, 1997 <br /> <br />SUBJECT: Agenda Item 17f. November 24-25,1997, Board Meeting-- <br />Highland Ditch Company <br /> <br />Approval of a Construction Fund Authorization in amount of $759,999 $1.04 <br />million to rehabilitate the Foothills Reservoir Dam, and approval of a $3000 <br />grant from the Small Dam Site Reconnaissance Fund to complete the <br />Feasibility Study, <br /> <br />BACKGROUND <br /> <br />Aod/LlBZ-- <br />The HigWand Ditch Company (located in T.iiftIler County) has applied for a Construction Fund <br />Authorization to undertake major rehabilitation of the Foothills Dam. They are requesting a <br />$159,909 $1.04 million Authorization from the Construction Fund for this project, 75% of the <br />estimated total cost of $1 millisR $1,390,766. This facility is located on a tributary to St. Vrain <br />Creek, about 5 miles west of Longmont (see attached map.) The dam was originally built around <br />the turn of the century, and has an inadequate spillway and severe seepage through the <br />embankment. The reservoir has a capacity of 4346 acre feet, but is restricted to gage 41 by the <br />State Engineer due to these safety concerns (as loss of about 450 acre feet.) <br /> <br />Smith Geotechnical Engineers has completed reconnaissance level engineering design work and a <br />cost estimate for the project. Smith Geotechnical has been hired by the Company to complete the <br />feasibility study at a total cost of $6000. <br /> <br />DISCUSSION <br /> <br />The purpose of the project loan is to rehabilitate one of the Company's reservoirs. <br /> <br />The Foothills Reservoir will have a capacity of 4346 acre feet after rehabilitation. It has lost 450 <br />acre feet of storage due to the gage 41 restriction by the State Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.