Laserfiche WebLink
<br />Series P-50 Unit Set up <br />CE Approvoo wuh,adclnd lkYIC{l<, <br /> <br /> <br />....... <br />-""~ <br /> <br />In addition to the pilot <br />testing field work, a work <br />plan will be prepared <br />outlining the various test <br />scenarios, operating <br />procedures, and the <br />results will be presented <br />in a Pilot Test Report. A <br />significant amount of <br />water quality testing is <br />included in the pilot <br />testing program to <br />monitor the water quality <br />of the various process <br />streams. The pilot testing <br />project also includes the <br />design and procurement <br />of a significant amount of <br />equipment, <br />instrumentation and <br />ancillary components <br />that have to be <br />assembled at the <br />Lochbuie site. It is <br />estimated that there will <br />be approximately 4 months of technical activities <br />prior to beginning field activities in April 2008, and <br />2 months to complete the reports after the tests are <br />completed in September 2008. The total duration of <br />the ZLD pilot testing project is approximately <br />11 months, and the estimated cost for labor, <br />utilities, equipment, and laboratory testing is <br />$475,000. <br /> <br />-- 9' 9' <br />~~ ~~.~:~~ <br /> <br />""~ 1 "''1/ 4 <br />r '? <br />. _ ::? ~ _... ~""n <br /> <br />.~ <br /> <br />I '" <br />9 <br /> <br />fII:fi' <br />l~aI <br />~ <br /> <br />"'--1 <br /> <br /> <br /> <br />'~e..[~:..:==tt <br /> <br />Powl'{'Suppl)' [)l~lltm <br /> <br /> <br />V~SEP <br />Series p.5(t <br /> <br />T~l XlM"lI <br />,,.- <br /> <br />Single Pass <br />Operation <br /> <br /> <br />The pilot test for each technology will utilize <br />concentrate from the Town of Lochbuie low pressure <br />RO system as the feedwater, which is representative <br />of a typical low pressure brackish RO process. Using <br />the Lochbuie concentrate will provide a sufficient <br />quantity of feedwater that both treatment <br />technologies can be testing simultaneously. The <br />Lochbuie RO system has been operating consistently <br />for several years, which will reduce the <br />potential variability of the concentrate being <br />tested. It is proposed to test each ZLD <br />technology at several different recovery ratios <br />to determine the practical operating limits. <br />The recovery will be increased in increments <br />and operated for approximately 2 weeks to <br />verify that mineral scaling will not adversely <br />impact the system performance. It is proposed <br />to test various recovery ratios, chemical <br />pretreatment alternatives, flux rates, and <br />chemical cleaning procedures during the <br />approximate 3-month test period. <br /> <br /> <br /> <br />liBi~mt(.]lIIIl.t:'III~~e(.].liF.TeiiA <br />