My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Bauer Lakes_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Bauer Lakes_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:57:51 PM
Creation date
9/13/2007 1:12:44 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Bauer Lakes Water Company
Description
Bauer Lakes Water Company Dam Outlet Structure Upgrade
Account Source
Basin & Statewide
Board Meeting Date
9/19/2007
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
upgrade : Date <br />Water Supply Reserve Account – Grant Appli cation Form <br />Form Revised July 2006 <br />_______________________________________ <br /> <br /> <br />9 . <br />Additional Information – If you feel you would like to add any additional pertinent information please <br /> <br />feel free to do so here. <br /> <br />This project could be viewed as the last 20% to “bring the <br /> <br />project home” -- to properly finish a current project <br /> <br />correcting the problems that prevent it from functioning as <br />efficiently as intended. <br /> <br />The members have existing debt of approx. $25K on the <br /> <br />reservoir from earlier work and $85K from the Colorado <br />Water Conservation Board loan for the recent pipeline <br /> <br />construction. This is their previous contribution to <br /> <br />constructing and maintaining the dam. They have also voted <br />to take on an additional $20K to accomplish this work. But <br /> <br />m embers don’t have the personal resources to take on this <br />additional project on their own, without hel p. B ut the <br /> <br />work needs to be done. <br /> <br />The lake/dam outlet issue was never part of the original <br /> <br />scope of work for the NRCS grant and it was closed out on <br />completion of the pipeline, before these issues became <br /> <br />apparent. No additional funds are available from t hat <br />source to fix the complications of this installation and <br /> <br />the earlier 1970’s work. <br /> <br />(See attached – continued) <br /> <br /> <br /> <br />The above statements are true to the best of my knowledge: <br /> <br />Signature of Applicant <br />: <br /> <br /> <br />Print Applicant’s Name <br />: <br /> <br /> <br /> <br />Project Title <br />: <br />Bauer Lake s Water Company dam outlet structure <br /> <br /> <br /> <br /> <br />8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.