My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Lower South Platte Wetland Initiative Phase I_Application-Void
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
South Platte - Lower South Platte Wetland Initiative Phase I_Application-Void
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2009 2:57:50 PM
Creation date
9/13/2007 1:06:03 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
Ducks Unlimited, Inc.
Description
Lower South Platte Wetland Initiative Phase I
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
C150415
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br /> <br /> Contribution <br /> Sources <br />Project Grant Match In- <br />Task $$ Match $$ Source kind Source Total <br />Task 1 $9,050 $3,359 Brush $12,409 <br /> $10,200 DU $1,097 DU $11,297 <br />Total $9,050 $13,559 $1,097 $23,706 <br /> <br />IV. Schedule <br /> <br />Proiect Timeline <br /> <br />Project Component <br />Survey <br />Design <br />Bid PackaQe <br /> <br />July 1, 2007 - July 1, 2008 <br />Summer Fall Winter Spring <br />X X <br /> <br />X X <br /> <br />X X <br /> <br />Golden Eagle Ranch <br />I. Task 1 <br /> <br />· Description of task: Conduct and complete a survey and design <br /> <br />· Method or procedure that will be used or followed to accomplish the task and identifY who will <br />undertake the task: Ducks Unlimited surveyors will conduct a survey of the impacted area, ideJ.1tified <br />on the attached map. A topographic survey will be developed from the survey using AutoCAD2007 <br />which will illustrate the 6" to 12" contours of the micro topography. DU's professional engineers will <br />work with landowners, and the contracted professional water engineers to provide a detailed design of <br />wetland impoundments, water level control structures, and water delivery infrastructure, including <br />pipeline. <br /> <br />· Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br /> <br />· Deliverables will include a detailed survey and design of the wetland project for the area <br />illustrated in the conceptual plan. <br /> <br />· Provide a detailed bid package including all plans and specifications, and quantities for <br />materials and equipment. <br /> <br />Task 2 <br />· Description of task: Complete water engineering and water court filings <br /> <br />Method or procedure that will be used or followed to accomplish the task and identifY who will undertake <br /> <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.