My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Ovid Reservoir Comprehensive Feasibility Study_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Ovid Reservoir Comprehensive Feasibility Study_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2013 12:57:32 PM
Creation date
9/13/2007 12:59:24 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
District 64 Reservoir Company
Description
Ovid Reservoir Comprehensive Feasibility Study
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150417
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br /> <br />5. Please summarize the proposed scope of work. Please refer to Part 2 of the Criteria and Guidance <br />document for detailed requirements. On the following page there is an example format for the Scope of <br />Work. You can use the example format or your own format, provided that comparable information is <br />included. <br /> <br />The scope of work should outline by task how the water activity will be accomplished. It is important that <br />the scope of work detail the specific steps, activities/procedures that will be followed to accomplish the <br />water activity and the specific products/deliverables that will be accomplished. The scope of work should <br />include but not be limited to: task description, key personnel, budget, schedule and deliverables and the <br />final report/project documentation upon completion of the water activity. <br /> <br />Phase I <br /> <br />Task 1 - Reservoir Operations and Modeling <br />A detailed evaluation of the possible operating scenarios will be outlined to provide information for decision <br />making by potential end users. Applegate Group will be the lead firm for the task. Mike Applegate and Dick <br />Stenzel will be senior advisors to the evaluation team lead by Richard Raines. Bennett Raley will provide guidance <br />on legal issues associated with the use of the reservoir. Operating scenarios will be developed for dry year, wet year <br />and average year hydrologic conditions. The administration policies currently in place for the South Platte River, <br />potential future policies that may be implemented and the implications of the Platte River Recovery Implementation <br />Program (PRRIP) obligations will be considered in developing the scenarios. A river basin spreadsheet model will <br />be developed using existing daily flow data that was originally developed for the reservoir when the decree was <br />awarded in Division 1 water court. The team will review the decree and determine options that are available to the <br />new ownership group. The daily flow model will be updated to incorporate the recent drought period. <br />Comparisons of this model will be made to the preliminary South Platte DSS modeling to incorporate improvements <br />where appropriate. Evaluation will include consideration of augmentation replacements, recharge accretions, non- <br />consumptive options, exchange considerations in this reach of river, and alternate points of diversion to the reservoir <br />via a well field. The team will also consider the long term impacts of changes in trans-mountain diversion reuse <br />water, compact obligations, and the PRRIP. <br />Deliverables for this task will include: <br />1. A detailed engineering report describing the assumptions, methodology, results and conclusions ofthe task. <br />2. A digital copy of the spreadsheet computer model with 30 years of daily flow record. <br />3. A user's manual for the spreadsheet model describing inputs. <br />The total fee for Task 1 is $112,000 <br /> <br />Task 2 Review of Preliminary Engineering on Ovid Reservoir <br />A review of the previous engineering work done by Applegate Group will be performed to evaluate conclusions and <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.