My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Ovid Reservoir Comprehensive Feasibility Study_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Ovid Reservoir Comprehensive Feasibility Study_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2013 12:57:32 PM
Creation date
9/13/2007 12:59:24 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
South Platte
Applicant
District 64 Reservoir Company
Description
Ovid Reservoir Comprehensive Feasibility Study
Account Source
Statewide
Board Meeting Date
9/19/2007
Contract/PO #
150417
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br /> <br />efforts in the basin pursuant to the March 2001 CWCB South Platte River Policy. <br /> <br />The CWCB has proposed a joint study of the project with the intention of developing a partnership between the <br />District 64 Reservoir Company and other agencies, possibly including the State of Colorado. This joint project will <br />include funding by CWCB from a former budget that studied potential Lower South Platte reservoirs including Ovid <br />Reservoir. The proposed CWCB study would be coordinated in conjunction with this scope of work and grant <br />application. The CWCB work will be done under a separate contract with other parties and will evaluate policy and <br />legal issues associated with the development of this project. Attached is an outline of the total scope of work <br />involved under both projects. The scope outlined for this grant application would pay for technical work, modeling <br />and permit applications during Phase I, and if found feasible, provide project management during Phase II to carry <br />the project forward to completion with the exception of actual construction funding. Sources and makeup of <br />construction funds will be determined in this study phase which may include grants or loans that could be obtained <br />through a variety of sources including the CWCB construction loan program. The budget is structured such that as <br />the project moves forward the task list has to be approved based on previous work and agreements. For example, <br />Final Design and the preparation of construction plans would not start until policy and legal issues were addressed <br />and agreements were reached between interested parties. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.