My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Romero-Guadalupe Channel Rectification Project_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Romero-Guadalupe Channel Rectification Project_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:44:59 AM
Creation date
9/13/2007 12:51:39 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Rio Grande
Applicant
Romero Irrigation Co.
Description
Romero-Guadalupe Channel Rectification Project
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
08000000060
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account – Grant Application Form <br />Form Revised May 200 7 <br />_______________________________________ <br /> <br />area and Jimmy Thompson across from the Rainbow Trout Ranch in Conejos Canyon. <br />Baca Gran de Water and Sewer District <br />The company recently furnished and installed over five miles of water and sewer pipe for the Baca Grande Water <br />and Sewer District. The company is also performing on an ongoing basis various road and pipeline installations <br />for t he District. The company has completed over $250,000 worth of work for the district. <br />Sheep Creek Subdivision <br />The company is currently in the process of completing over four miles of road and waterline for the Sheep Creek <br />Subdivision. The company has supp lied and installed two 5000 gallon Xerex water storage tanks for the <br />subdivision and is currently operating and treating the water system in the subdivision. The company constructed <br />the bridges crossing the Conejos River and Sheep Creek. The company also c onstructed the turning lanes on <br />Highway 17 mile post 22 entering the subdivision which entailed excavation and placement of material, <br />construction surveying, and seeding and mulching, The company also constructed the existing bridges over the <br />Conejos River and Sheep Creek in the sub - division. Sum of all work accomplished is approximately $500,000 to <br />$600,000 <br />Colorado Department of Transportation <br />The company has supplied CDOT with several thousand tons of various aggregate such as Pit Run, 3/8 chips, <br />Sanding material and Cass 6. Approximate sum of all material is over $60,000. <br />United States Department of Agriculture <br />The company has constructed numerous irrigation ponds and furnished and installed several miles of waterline for <br />the department. Other work inc ludes furnishing and installing Rip Rap for erosion control. The company has also <br />constructed numerous J - Hooks and other type of structures for water diversion and erosion control. <br />Conejos Water Conservancy District <br />Since 1976 The company has done numero us projects for the Conejos Water Conservancy District. We have built <br />several dam structures throughout the district and have also done a lot of channel work and river maintenance <br />which included moving numerous gravel banks, and cleaning around head gates throughout the Conejos River . <br />Along with the river maintenance and channel work The company has also done lots of flood and erosion control <br />which include J - Hooks, weirs and other similar type rock structures. We have also cleaned and constructed several <br />miles of ditch throughout the district. Along with the above we have for the past 20 years opened the road from the <br />Platoro turn off to the dam so that the conservancy is able to adjust water flows in the Conejos River. We are <br />familiar with and have wo rked with all of the permitting such as the Army Corps of Engineers require, that pertain <br /> <br />to this type of work. <br />Union Mines <br /> <br />The company has for the past 20 years opened Forest Road 250 from Highway 17 at Horca to Platoro Reservoir. <br />We have also accomplish ed several mine reclamation projects at the Platoro mine site involving massive amounts <br />of earth moving, pipeline installation, and retention pond construction. <br /> <br />III. Budget <br /> <br /> <br />Cost of Project: <br />Rock for weirs and J - hooks – 2270 cubic yards @ $30.83 per yar d = $69,984 $ 70,000 <br /> <br /> <br /> <br />13 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.