Laserfiche WebLink
Water Supply Reserve Account – Grant Application Form <br />Form Revised May 200 7 <br />_______________________________________ <br /> <br />numerous occasions. It is knowledgeable and familiar with the rock weirs and J - hook structures proposed here, <br />developed by D.L. Rosgen, P.H. of Pagosa Sprin gs, and has used them on the river for several years. <br /> <br />Tabor: There are no Tabor issues as the applicant entity is a 501(c ) (12) entity. <br /> <br />Scope of Work <br /> <br /> <br />5 . Please summarize the proposed scope of work. Please refer to Part 2 of the Criteria and G ui dance document for <br />detailed requirements. On the following p age there is an example format for the Scope of Work . You can use the <br />example format or your own format, provided that comparable information is included. <br /> <br />The scope of work should outline by ta sk how the water activity will be accomplished. It is important that the scope <br />of work detail the specific steps, activities / procedures that will be followed to accomplish the water activity and the <br />specific products/deliverables that will be accomplished . The scope of work should include but not be limited to: task <br />description, key personnel, budget, schedule and deliverables and the final report/project documentation upon <br />completion of the water activity . <br /> <br />I . Task <br /> <br />Overview of task: <br /> The Romero - Guada lupe Channel Rectification Project requests $83,700 from the SB179 Rio <br />Grande Basin Account in order to fund the re - shaping of the channel of the Conejos River at the project location <br />(described below and in attached maps ) and the placing of rock water con trol structures as designed by the NRCS. <br />NRCS has done the accompanying engineering and the drawings based on acceptable procedures for the <br />installation of rock weirs and J - hooks . A copy of the NRCS work plan and engineering drawings for the Romero <br />Irrigat ion Company are attached in Appendix A. Also attached is the Conservatin Plan Map for Guadalupe Main <br />Ditch portion of the task , which NRCS has completed sufficiently enough to d etermine the scope of work and <br />costs for this proposal. Final details for the Guadalupe drawings are close to completion as of this writing and we <br />anticipate forwarding them to support this application in July. <br /> <br />Method / Procedure to accomplish the task <br /> <br />As described in the enclosed “Plans for the Construction of Conejos River Di version & Streambank Protection”, t he tasks <br />for the placement of W - weir rock structures and J - hooks will follow standard accepted procedures and will conform to <br />NRCS specifications . Ditch company supervision and consultation will be provided at one quarter time over six months, <br />ensuring that these specifications are met. <br /> <br />W - Weir rock structures: <br /> The design of the W - Weir (W as looking in the downstream direction) will be <br />installed to resemble bedrock control channels on larger rivers , avoiding the unnatura l and uniform “line <br />of rocks” that detracts from visual values. The W - Weir is similar to a Cross - Vane in that both sides are <br />vanes directed from the bankfull bank upstream toward the bed with similar departure angles. From the <br />bed at ¼ and ¾ channel width, the crest of the weir rises in the downstream direction to the center of the <br />bankfull channel creating two thalwegs ( see Figure 5 , in Rosgen’s description, attached ). The objectives <br />of the structure are to provid e grade control , enhance fish habitat, stab ilize stream banks , facilitate <br />irrigation diversions, and incre ase sediment transport . Habitat for trout is enhanced by maximizing usable <br />holding, feeding and spawning areas. Fish hold in the multiple feeding lanes created by the two thalweg <br /> <br /> <br /> <br />10 <br /> <br />