My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Paonia Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Paonia Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2012 1:45:10 PM
Creation date
9/13/2007 10:43:23 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
North Fork River Improvement Association
Description
Paonia-Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
150411
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLORADO WATER CONSERVATION BOARD <br /> <br /> <br />WATER SUPPLY RESERVE ACCOUNT <br /> <br /> <br />200 6 - 2007 GRANT APPLICATION F O RM <br /> <br /> <br /> <br /> <br /> <br />Paonia - Feldman Diversion Reconstruction , Part 1 , North Fork <br /> <br />of the Gunnison River <br /> <br />Name of Water Activity/Project River Basin Location <br /> <br /> <br />$ 48,000 <br />Basin Account <br />X <br />Yes <br /> <br /> <br /> <br /> <br />No <br /> <br /> <br />Statewide Account <br /> <br /> <br />Amount of Funds Requested <br />Please Check Applicable Box <br />Approval Letter Signed By <br /> <br />Roundtable Chair and <br />Description of Results of <br /> <br />Ev aluation and Approval Process <br /> <br /> <br />* For the Basin Account, the Application Deadline is 60 Days Prior to the Bimonthly CWCB meeting. The <br /> <br />CWCB meet ings are posted at www.cwcb.state.co.us and are generally the third week of the month. <br /> <br /> <br />* For the Statewide A c count, the App lication Deadline is 60 Days Prior to the March and September <br />CWCB Board Mee tings. <br />* In completing the application you may attach additional sheets if the form does not provide adequate <br />space. If additional sheets are attached please be sure to reference the section number of the application <br />that you are addressing (i.e., A.1. etc.). <br /> <br />Instructions : <br /> This application form should be emailed, typed, or printed neatly. The Water Supply Reserve <br />The criteria an d guidelines <br />Account Criteria and Guidelines can be found at http://cwcb.state.co.us/IWMD/ . <br />should be reviewed and followed when completing this application <br />. You may attach additional sheets as <br />necessary to fully answer any question, or to provide additional information that you feel would be helpful in <br />evaluating this application. Include with your application a cover letter summarizing your request for a grant. If <br />you have difficulty with any part of the application, contact Rick Brown of the Intrastate Water Management and <br />Development (Colorado Water Conservation Board) for assi stance, at (303) 866 - 3514 or email Rick at <br />rick.brown@state.co.us . <br />Generally, the applicant is also the prospective owner and sponsor of the proposed water activity. If this is not the <br />case, contact the Rick Brown before completing this application. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.