Laserfiche WebLink
<br />NUY-U~ CUU{; !W <br /> <br /> <br /> <br /> <br />Task 3.. Feasibility Study RelXn't <br /> <br />The FC~lsibility Report will be prepared containing the fmdings and recommendations for each of <br />the project alternatives and discuss how the Stonn Drainage Master Plan impacts the project. <br />After completing the hydraulic analyses, the project team will develop a draft priority Hst based <br />on factors such as cost, technical feasibility and community priorities. <br /> <br />Many times it is difficult to quantify community priorities because they are commonly based on <br />intangible factors. Therefore. NoltelEDRC will work with the Town to identify a process of <br />incorporating the intangible needs of the community into prioritizing the alternatives. The <br />engineEl1'ing team will work closely with the Town staff'who will prepare and provide the <br />economic and ~ial portions oftbc fuasibility analysis. The report is to be completed in a <br />specui<: format as required by the CWCB (see below). Economic and financial information of <br />the Town of Wellington is required as part of the report. This information will include details <br />about the Town's intentions regarding the repayment of a construction loan from CWCB. A <br />guatanlteed source of funding will be required (not contributions nom the General Fund). In <br />addition, information regarding the Townts experience in repaying sjmilar obligations will be <br />required. The NohclEDRC team will rely on the 1'0wn staff to prepare this data. <br /> <br />The selected project will be documented in the Final Feasibility Report. The preferred alternative <br />will have a more complete cost evaluation fOr inclusion into the Final Feasibility Report. The <br />study requires a significant amount of input from the Town for completion. This means <br />information provided to the report by Town statTand information provided from the citizens at a <br />public information meeting. <br /> <br />As stflted above, the C WCB has a specific fOrmat fur oompleting the Feasibility Report. An outline <br />of the required format is shown below. The deadline for submission of the Feasibility Report is <br />January 2001 to meet the budget cycle for the state's fiscal year 2001. The project team will work <br />in concert with the Town staff to meet this important deadline. <br /> <br />The "Coal Creek Drainage Feasibility Study' will generally conform to the following outline. <br /> <br />. Study Objective <br />. Description of Sponsoring Entity <br />. Outline of Previous Studies <br />. Description of Study Area <br />. Project Need <br />. Protected Project Lands <br />. Hydrology and Water Rights <br />. WatBr Quality <br />. FIeld Invest.iQations <br />. Fonnulation and Evaluation ofProjcct Design Alternatives <br />. Description ofthe Prefurred Alternative <br />. Prefl:J:red Project CostlBenetlt Analysis <br />. Economic Analysis of Preferred Project (includes construction fundini and loan <br />repayment strategy) <br /> <br />11101100 <br /> <br />G;\P Iwr'.proposal\Ilotrl'YllJln 2000\FCS _OOc:.dOt' <br />