My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:14 PM
Creation date
8/9/2007 8:49:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
IWMD Section - Colorado's Future Water Supply Needs - Update on Consumptive and Non-Consumptive Workgroups
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />for all major mainstem tributaries (e,g" Fraser, Roaring Fork, Poudre) and their significant tributaries (e,g" Fryingpan, <br />Crystal, Hunter Creek), <br /> <br />4,Implementation <br /> <br />The Basin Roundtables will be critical to implementing recommendations produced by their nonconsumptive needs <br />assessments, I n addition, to considering how to ensure that basins meet both the consumptive and non-consumptive needs <br />that SWSI, the 1177 and other processes identify, the Basin Roundtables, along with assistance from the I BCC, can use the <br />information that the NCNA Workgroup develops to: <br /> <br />. <br /> <br />Encourage water suppliers to consider this information when planning their projects and processes, <br /> <br />. <br /> <br />Identify projects and processes to meet these needs, <br /> <br />. <br /> <br />Identify additions to other processes or projects developed to meet other needs that might also meet the <br />nonconsumptive needs, <br /> <br />. <br /> <br />Identify and assist in securing funding for such projects and processes, and <br /> <br />. <br /> <br />Ensure development and implementation of sufficient projects and processes to meet these nonconsumptive needs <br /> <br />5, Prod ucts <br />The following products are expected as part of the work completed by the NCNA Workgroup: <br /> <br />. <br /> <br />As complete as pOSSible a set of GIS coverages representing Colorado's important environmental and recreational <br />attributes, both at the state and basin levels (the latter where a coverage is specific only to a single basin or only to a <br />few basins in the state), <br /> <br />. <br /> <br />A map of prioritized areas and reaches <br /> <br />. <br /> <br />A set of model flow templates that describe natural flow regimes for different stream types and associate non- <br />consumtpive values with components of the hydrograph <br /> <br />. <br /> <br />Site-specific flow quantifications for priOritized reaches, where the triage suggests a quantification should be done and <br />where data are available <br /> <br />6, Funding <br /> <br />There is not likely to be sufficient HB1400 funding to complete the nonconsumptive needs assessments within the current <br />schedule of updating all of the Basin Roundtable's Need Assessments by end of 2008, Therefore, it will be necessary to <br />supplement the funding to complete these tasks SB 179 money is available to do so Several eligible recipients of Water <br />Supply Reserve Account funds intend to apply to the CWCB for state-wide account funding to supplement what will be <br />available under HB 1400 so that the roundtables can complete their nonconsumptlve needs assessments <br /> <br />Page 5 of5 <br /> <br />O:\Rinkt';rM:K\S\VSI\strat~gy n~vist';t1 o IjullO 7 Jt:,'ist:d by BM.uoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.