My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:37 PM
Creation date
8/8/2007 3:03:30 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
IWMD Section - Water Supply Reserve Account July 2007 Grant Allocations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />A <br />. <br /> <br /> II Project Management Plan - Small Project <br /> (Short Form) <br />-=-- iIJob Name: Enlar~lement of Jackson Gulch Dam Date Submitted: 09/07/06 <br /> I' <br /> ! <br /> ,JCN: WOlD: <br /> il <br /> i <br />:!Team Leader: (name/code/telephone) Client Group or Region: <br /> ilPE - Mark Barraclouqh, 86-68313, 303-445-2987 Upper Colorado <br /> ;: Supervisor: (name/code/telephone) Client Office: <br /> II <br /> !I Karen Knight, 86-08313, 303-445-3044 Western Colorado Area Office <br /> II Client Liaison: (n.ame/code/telephone) Client Contact: (name/code/telephone) <br /> i! Brad Dodd, WCD, 970-385-6557 <br /> " <br />1. Objectives: (list features, deliverables, and objectives) <br />Jackson Gulch Dam - Prepare a feasibility level study for increasing the storage capacity of the reservoir for municipal <br />~nd industrial purposes. It is estimated that this increase would include increasing the dam height by three to four feet. <br />It is assumed that other project features (spillway, outlet works) do not require modification to meet increased demands <br />~s a result of the inGreased capacity. <br /> II <br />Deliverables: Scoping Study List of Alternatives and Relative Ranking <br /> I! Feasibilty Study - Technical Memorandum outlining alternatives evaluated, studies performed, and <br />construction cost estimates. <br />2. Scope of Wor~:: <br /> , <br />~) Perform scoping, meeting to brainstorm alternatives. Develop list of alternatives and rank according to ability to meet <br />the project needs, relative cost, constructability, and other factors determined at the time of the study. Develop short list <br />of alternatives for more detailed evaluation. <br />Ii <br />:1) Perform feasibility level studies on up to three alternatives developed from the scoping study. Conceptual <br /> Iternatives will be developed to compare cost estimates. It is assumed that all alternatives will be developed by TSC <br />t6am based on existing data and no new field data will be provided. <br />II <br />I! <br />3. Schedule: Milestone Dates Resource Assigned <br /> Start: September 2008 None assigned until work <br /> reauest received <br /> Complete: Auqust 2009 <br />" 2009: <br />4. Financial Plan: FY Staff Days <br />;1 <br />II Task List and/or Organization Code SL 1 SL2 SL3 SD Total $ Non-Labor <br /> , <br />~6-68130 (Waterways and Concrete Dams) 6 1 <br />" <br />86-68313 (Geotechnical Engineering) 10 40 8 <br />I! <br />~6-68320 (Engineering Geology) 6 1 <br />86-68170 (Cost Estimating) 10 <br />II <br />86-68410/86-68420 4 <br />'I <br />86-68460 2 <br />I <br />86-68160 (Construction Management) 4 <br />II <br />~taff Day Totals 10.0 52.0 30.0 92.0 <br />FY 2005 Cost Totals $7000 $44,096 $29,520 $29,520 $80,616 <br />liotal FY 2005 Bud~let $88,680 (includes 10% contingency) <br />" <br />::5. Roles and Responsibilities: (list names, telephone num~ers, and roles) <br />II <br /> Responsibilities have not yet been assigned. <br />II <br />II <br />II <br /> <br />Revised March 24 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.