My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12654
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:09 PM
Creation date
8/6/2007 1:40:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River - Water Projects - Glen Canyon Dam-Lake Powell - Glen Canyon TWG
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/7/2001
Author
Glen Canyon Dam TWG
Title
Glen Canyon Dam Technical Work Group - Operating Procedures - 09-07-01
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />",1') 3":? 6 <br /> <br />60 '- .3 '2 (p <br /> <br />. <br /> <br />equipment, and block a number of hotel guest rooms. Meeting rooms will be arranged so that each <br />of the 26 TWG members can be seated around the table. Alternates representing an absent TWG <br />member should take their place at the table. Additional seating will be provided around the margin <br />or rear of the room for alternates who are attending with the member, for official visitors and for the <br />general public. <br /> <br />i <br />i <br />} <br />:_l <br /> <br />12. Public. Visitors. and Open and Closed Meetings. - All meetings are open to the public. It is not <br />anticipated the group will require closed sessions unless a provision is made to do so. Onlymembers <br />of the TWG or their alternate may participate in discussions of the group. Appropriate staff of <br />Reclamation and the GCMRC shall provide pertinent information from their organization to respond <br />to questions or make presentations when approved by the group. The public will be allowed to <br />comment after discussion of each agenda item requiring a decision of that group and at the end of <br />the TWG meeting or as provided in the agenda. Each person will be given up to 10 minutes to <br />address the TWG members at the time specified on the agenda for public comment. Greater <br />consideration will be given to individuals submitting discussion issues and/or requesting time in <br />advance of the meeting to the Chairperson. The Chairperson will control adherence to the time limit <br />so the meeting is not unduly prolonged. Each speaker will be expected to provide their name and <br />affiliation for the meeting minutes. The Chairperson will accept written comments from the public, <br />and will allow their distribution if copies are available for all members (40 copies required). Written <br />comments will be attached to the meeting minutes if they are identified with the name, address, and <br />affiliation of the provider. <br /> <br />I <br /> <br />ilt, <br /> <br /> <br />. Phoenix, Arizona. <br /> <br />Chairperson <br /> <br />-?.d",1 Cr/ <br /> <br />Date <br /> <br />I <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.