My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12647
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12647
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:08 PM
Creation date
8/6/2007 1:40:42 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.A
Description
Colorado River - Water Projects - Glen Canyon Dam-Lake Powell - Glen Canyon AMWG
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/17/2002
Author
Glen Canyon AMWG
Title
Glen Canyon Dam Adaptive Management Work Group - Operating Procedures - 01-17-02
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i <br />--i <br /> <br />001525 <br /> <br />..--, <br /> <br />I <br /> <br />Telephone conference meetings must have a notice in the Federal Register 15 days prior;:o the call. <br />There must be adequate opportunity for the general public to listen to the conference call. <br /> <br />The AMWG may conduct business outside of formal meetings through telephone polls conducted <br />by the Chairperson or his/her designee. In emergency situations, telephone polls can be requested <br />by the AMWG member to act on clearly defined written motions for AMWG approval. Following <br />approval by the ChaiIperson, a telephone poll will be conducted within seven working days. During <br />a telephone poll, all members will be contacted and requested to vote. Approval ofa motion requires <br />a two-thirds majority of all members voting. The Chairperson is responsible for documenting in <br />writi~g how each member voted and distributing the record to all AMWG ~embers. <br /> <br />J <br />I <br /> <br />12. Renorts and Record Keening:. The Annual Report (AR) required by the Grand Canyon <br />Protection Act shall be reviewed by the AMWG. The State of the Natural and Cultural Resources <br />in the Colorado River Ecosystem report developed by the Grand Canyon Monitoring and Research <br />Center will be attached to the AR and shall contain information on the condition of the resources <br />impacted by the operation of Glen Canyon Dam. The AR shall be concise, containing critical <br />resource issues and recommendations to the Secretary on future dam operations. <br /> <br />Bureau of Reclamation staff will supply GSA the required information to complete the summary <br />report for Federal Advisory Committees. <br /> <br />13. Committee Exnenses and Cost Accountine. An accounting of the expenses for operation of the <br />AMWG shall be maintained by Reclamation. Expenses and other information will be submitted to <br />GSA as required by F ACA. Committee expenses are limited to approximately $200,000 annually. <br /> <br />~ <br /> <br />SUB-GROUPS <br /> <br />1. Formation. The AMWG may form. sub-groups in order to facilitate the mission of the AMWG <br />as identified in the Act and the AMWG Charter. Sub-groups will be formed for completion of <br />specific tasks or for specified periods of time. Sub-group members will be named by the members <br />of the AMWG. Upon formation ota sub-group, the Chairperson of the AMWG, with the advice of . <br />AMWGmembers, will approve nominated members to serve on the sub-group. Effort shall be made <br />to keep sub-groups small. Sub-groups will be formed or dissolved by a vote of the AMWG. <br /> <br />I <br /> <br />2. Requirements. Sub-groups may choose their chairperson from among the AMWG named sub- <br />group members. The chairperson of any sub-group may convene group meetings at his or her <br />discretion. Sub-groups may develop their own operating procedures. Sub-group meetings must <br />follow requirements of F ACA, except they need not be chartered and members need not be <br />appointed by the Secretary. One standing sub-group of the AMWG will be the Glen Canyon Dam <br />Technical Wark Group (TWG). The TWGmembership shall consistof one representative from each <br />organization represented in the AMWG, with the exception that two members from the <br /> <br />~~l <br />, <br /> <br />L_::\ <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.