My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12563
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12563
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:52 PM
Creation date
8/6/2007 8:50:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.750
Description
Colorado River Basin - Salinity Projects and Issues in Colorado - Mancos Valley
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/2002
Author
DOI-BOR
Title
Draft Environmental Assessment - Mancos Projects Carriage Contracts - DOI-BOR - 03-01-02
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />u01984 <br /> <br />MEASUREMENT AND RESPONSIBILITY FOR DISTRIBUTION <br /> <br />5. (a) The Contractor agrees to provide and maintain a measuring device, which is <br />acceptable to the Contracting Officer and District, at or near the Contractor's point of diversion, <br />to measure the quantity of water delivered and diverted under this contract. <br />(b) The District will provide an annual accounting to the State of the amount of <br />non-project water carried through Project facilities pursuant to this contract.? <br />(c) Neither the United States nor the District shall be responsible for the control, <br />carriage, handling, use, disposal, or distribution of water taken.by the Cory tractor hereunder, and <br />the Contractor shall hold the United States and District hartri1e~s'bn accou~fofdamage or claim <br />of damage of any nature whatsoever, including property damage, personal injury, or death <br />arising out of or connected with the control, carrt'age, handling, use."disposal, or distribution of <br />. ..~~ <br /> <br />such water by the Contractor. <br />CONDITIONS AFFECTING CARRIAGE AND DELIVERY OF WATER <br />6. (a) Neither the United States noi the,District shall be responsible for the failure to <br />carry water as provided in this contract resultiIlg frornlackof.c~pacity or for any cause beyond <br />the reasonable control of the'XUJ1ited States or the District. The United States and District also <br />reserve the right to~elIlP:farily ce~ls~ deliveries of \Vater through the Mancos Project facilities <br />during periods when thefagmtiesw~4~watered fotinspection, maintenance, and other operating <br /> <br />requirements. <br /> <br />(b) Thec.;o.J!tractor,~~~es Ilot to interfere with any headgate, tapbox, weir, or <br />otherdevic~used by the Di~tJ:ict for the.distribution of water through project facilities by any <br />means whatsoever, and shalln.<)t in any way obstruct the Mancos Inlet and Outlet Canals or any <br /> <br />. .- <br />other project faci~ty or permiljts agents or employees to do so. The District is hereby <br />authorized to cease Carryillgthe water of the Contractor for such periods of time as may be <br />determined by the Dis,triCt if the Contractor, its agents or employees violate the provisions of this <br />article. <br /> <br />DEFAULT OF PAYMENT <br /> <br />7. Non-payment of any portion of any charges provided for in this contract the District, <br />may result in termination of Contractor's right to carriage and delivery of Contractor's non- <br /> <br />33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.