My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rifle WCPlan ApprovalLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Rifle WCPlan ApprovalLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:32:44 AM
Creation date
8/3/2007 3:42:07 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-17
Applicant
City of Rifle
Project Name
City of Rifle Water Conservation Plan
Title
Grant Application for City of Rifle
Date
7/19/2007
County
Garfield
Water Efficiency - Doc Type
Approval Letter
Document Relationships
Rifle_WCPlan2008
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Water Conservation Planning Grant Application <br /> <br />City of Rifle <br /> <br />o The consultant team includes Mr. Dan Richardson, a resource efficiency expert, <br />who recently joined SGM. Mr. Richardson brings unique bxpertise to the project <br />I <br />in developing and implementing public sector resource efficiency programs. His <br />recent experiences include launching a sustainable design firm, serving as a <br />Glenwood Springs City Council member, and being the first Global Warming <br />Project Manager for the City of Aspen. <br /> <br />Name <br /> <br />John Hier <br /> <br />Charlie Stevens <br /> <br />Dick Deussen <br /> <br />Bill Sappington, <br />P.E. <br />Marco Carani <br /> <br />John Stewart <br /> <br />Tom Whitmore <br /> <br />Lynn Miller <br /> <br />Warren Swanson, <br />P.E. <br /> <br />Shannon Ullmann, <br />E.I.T <br /> <br />Dan Richardson <br /> <br />Jeff Simonson, P.E. <br /> <br />Louis Meyer, P.E. <br /> <br />SGM # 99055A-387 <br /> <br />'fable 1. Proiect Team Make-up and Roles I <br />Title/Role Expected Contribution I <br />Citv of Rille Team Members I <br />City Manager Attend select meetings and provide input on key <br />decisions; serve as liaison to btv Council <br />Project champion on the CitY's side; responsible for <br />key project decisions, engaging the City Mgr. and <br />Council, and ensuring consultant receives resources <br />needed from the City to c6mplete the Plan; also, <br />attend oroiect meetings, and teview olan documents <br />Public Works Attend and help schedule project meetings; <br />Project Engineer coordinate project invoicing; I collect data required by <br />consultant; provide input on water and wastewater <br />infrastructure impacts; perfohn calculations; review <br />work oroducts I <br />Attend meetings and review work products; bring <br />longer historical perspective fo the table. <br />Provide input and information regarding water meter <br />coverage and conditions; attehd meetings and review <br />work products. I <br />Attend project meetings; collect relevant water <br />system operations informatidn, esp. regarding water <br />production and treatment I <br />Provide input regarding park irrigation water use and <br />ideas for reduction/efficiendy. Serve as a team <br />resource for landscape irrigatibn measures/prol.!:rams. <br />Provide input and information regarding billed water <br />and rates, etc. I <br />Consultant Team (SGM) Members - I <br />Project Manager Lead overall project, direct Iconsultant team, and <br />perform project work. Ultimately responsible for all <br />mana.l?;erial and technical facets of the project. <br />Project Engineer Perform day-to-day project work under direction of <br />project manager - researchl data collection and <br />processing, cost-benefit analyses, preparation for <br />meetings, final document production <br />Provide input on issues co~cerning public policy, <br />community outreachlpartidipation, and City <br />government en.l?;agement; revibw draft plan <br />Provide input regarding Rifle history, existing <br />infrastructure, etc. I <br />Project Principal Provide QA/QC review; ensure consultant team has <br />organizational resources nebded to complete a <br />successful proiect I <br /> <br />Water and <br />Wastewater <br />Utility Director <br /> <br />Public Works <br />Director <br />Collection and <br />Distribution <br />Manager <br />Water Supervisor <br /> <br />Parks Director <br /> <br />Billing Clerk <br /> <br />Efficiency <br />Consultant <br /> <br />City Engineer <br /> <br />2-2 <br /> <br />Section 2.0 - Required Grant Application Info. <br />
The URL can be used to link to this page
Your browser does not support the video tag.