Laserfiche WebLink
<br />CWCB Water Conservation Planning Grant Application <br /> <br />City of Rifle <br /> <br />supplies and infrastructure, analysis of potable system, reliability, historical <br />potable water demand analysis and future projections, and projection of potable <br />system infrastructure needs and costs through 2025. It al~o includes a financial <br />spre'adsheet for projecting required rate and fee increa~es over time to fund <br />capital projects in the potable system. For water conservation planning purposes, <br />the spreadsheet will be extended to include operations and! maintenance (O&M) <br />costs, purchased water costs, and raw water system costs; it will be used in place <br />of standard CWCB worksheets for determining the effect of conservation <br />measures and programs on the total cost of water service. I An additional note is <br />that future water demands, infrastructure requirements, and costs were projected <br />based on an anticipated annual growth rate in water demadd of 4.5%. The most <br />recent projections for annual growth are higher; howevet, for the purposes of <br />cost..benefit analysis in this Plan, 4.5% annual water demarld growth will be used <br />to avoid the need to revise the baseline infrastructure and tost projections of the <br />"no conservation" case. I <br /> <br />For this project, the following sub-tasks will be required to augment work <br />already completed for Steps #1 through #3 as part of the Water Master Plan: <br />I <br />o Past and present water conservation efforts and et~ects, if any, will be <br />summarized. It is anticipated that only passive conservation has occurred to- <br />date. [City stafJ) I <br />o More detailed evaluation of existing water use by sector, per capita, per <br />I <br />household and by season with comparison to national1regional values. The <br />goal is to establish a basis for identifying and evaluating conservation <br />I <br />measures and programs (Steps #5 and #6). [ConsultantJ/ <br />o Compilation and review of data related to water metering coverage, meter <br />, <br />conditions, water rate/fee structure, and water billing process. This <br />information will help identify and evaluate consertation measures and <br />programs (Steps #5 and #6). [Consultant/City stafJ) I <br />o Analysis of existing, and rough projection of future, lfixed and water-use- <br />dependent O&M costs for the water and wastewater systems. This will allow <br />quantification of cost-savings benefits of conserv~tion measures and <br />programs (Step #6). [City sta./flConsultant} I <br />o Identification of future water supply costs (Le. legal and volume costs to <br />purchase augmentation water) to allow quantification 10f water acquisition <br />benefits of conservation (Step #6). [City stafJ) <br />o Compilation and analysis of existing raw water use, infrastructure, and O&M <br />costs and development of future projections. [Consultant} <br />o Projection of future wastewater treatment capital project!costs. [ConsultantJ <br />o Incorporation of potable system O&M and water acquisition costs, raw water <br />I <br />system costs, and wastewater system costs into existing capital planning <br />financial spreadsheet to allow economic evaluation of conservation effects <br />(Step #7). [Consultant} <br /> <br />c. Task 02: Identify Water Conservation Goals (Planning Step #4) <br />[Task responsibility: 50% City staff /50% Consultant} I <br />Work under this task will establish an initial estimate of a "blest-fit" overall water <br />conservation goal for the City. It is envisioned that this initial estimate will be <br />developed by considering the following: I <br />o Degree of City Council support for water conservation (initial meeting with <br />Council to be held as part of this task) [Consultant/City StafJ) <br /> <br />I <br />SGM # 99055A-387 2-8 Section 2.0 - Required Grant Application Info. <br />I <br />