My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10406
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:01 PM
Creation date
8/2/2007 4:13:45 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Cherry Creek
Stream Name
Cherry Creek
Title
Agenda Item 11.f Sept. 27-29, 1999 Board Meeting - Report Regarding the Cherry Creek Dam Safety Study
Date
9/17/1999
Prepared For
CWCB Board Members
Prepared By
Larry Lang
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />': <br /> <br />at Ii> <br /> <br />I <br />I <br />I <br />, I <br />-Lj Colorado Water Conservation Board <br /> <br />, Department of Naturall Resources <br />1 31 3 Sherma n Street i <br />Denver, Colorado 80203 : <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORAI)O <br /> <br />. <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Covernor <br /> <br />TO: ' <br /> <br />Colorado fWater Conservation Board Members <br /> <br />i1v <br />Larry Laqg L.-: <br /> <br />Creg E, Walcher <br />Executive Director, ON R <br /> <br />Peter 1-1. Evans <br />Director, eweB <br /> <br />FROM: <br /> <br />I <br />DATE: Septemb~rl7, 1999 <br /> <br />I <br />SUBJECT: Agenda I~em l1.f September 27-28, 1999 Board Meeting-- <br />Report regarding the Cherry Creek Dam Safety Study <br /> <br />BACKGROUND <br /> <br />'."~,') <br />',. .... 4' <br /> <br />I <br />I <br />On February 5 and 17, 1999, the Corps of Engineers, Omaha District, conducted public hearings <br />on the dam safety study for the Cherry Creek Dam and Reservoir. The public hearings attracted <br />much public concern anq raised many issues and questions regarding the study findings. The <br />Board has also received many questions. The Board responded to these questions and concerns <br />by conducting a basin to~r and discussions at its March 29-30, 1999 Board meeting. The Board <br />made a recommendation ito staff to seek legislative authorization and funding to perform a <br />technical review for the Probable Maximum Precipitation (PMP) and Probable Maximum Flood <br />(PMF) values. The lang~age in Section 16 of the CWCB Construction Bill 99-173 provides the <br />authorization and funding to seventy five thousand dollars ($75,000). On July 21,1999, the <br />Corps of Engineers, in cdoperation with Colorado Water Conservation Board, conducted a <br />formal technical discussion with a panel of meteorological and hydrological experts that were <br />jointly selected by the Cqrps and the Board. The panel heard testimony from the Corps and the <br />National Weather Servic~ (NWS) regarding the PMP models - HMR's study procedures and <br />parameters. <br /> <br />, <br />Following the formal pre~entations by the Corps and NWS, a technical discussion was conducted <br />for 36 topics regarding th:e "Site Specific Probable Maximum Precipitation Study for the CherTY <br />Creek Drainage in Color~do" dated July 12, 1995. Most of the discussion topics reached an <br />answer of "No consensusiby the group". It should be noted that one desenting vote would result <br />in the no consensus answ~r. The findings of the July 21, 1999 review is presented in a <br />Summary Report entitledi"Cherry Creek Dam Safety Study, Summary Report, dated August 5, <br />1999". ' <br /> <br />.'1 <br />..,.' "ft <br />~". t <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.