My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10403
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:04 PM
Creation date
8/2/2007 4:13:43 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Cherry Creek
Stream Name
Cherry Creek
Title
Meeting Minutes - Cherry Creek Dam Safety Study - Technical Review Meeting #1
Date
11/3/1999
Prepared By
Larry Lang
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DRAFT <br />MEETING MINUTES <br /> <br />I <br /> <br />Cherry Creek Dam Safety S~udy <br />I : <br />Technical Review Meeting 1#1 <br /> <br />I <br />By <br />Larry Lang, Project Director, Colorado Wat,er COl1lservation Board <br /> <br />These minutes are providedJor the November 3, 1999 Cherry Creek tei,r:hnical meeting n located <br />at the City of Greenwood Village municipal building: <br /> <br />, <br />I Background discussions were held in order to provide councilman elect Doug Morris with an <br />understanding of the Cherry Creek Dam Safety issues. (Attendance: list is attached). <br />I <br /> <br />1) Larry Lang presented the different PMP and storm studies. See table 1 (attached) for study <br />results. <br /> <br />2) The results presented iri table 1 clearly demonstrate that procedures, assumptions, professional <br />opinions, and technical judgment play an important role in the final PMP and PMF values for the <br />Cherry Creek basin. <br /> <br />3) The CWCB memorand~m dated September 17, 1999 provides a 111lore complete background of <br />the technical review actiyities to date (see attached memo). <br />I <br />I <br /> <br />4) The State of Colorado and Cherry Creek basin entities have not received a formal response or <br />schedule following the Corps of Engineers/National Weather Service joint review meetings held <br />on July 21-22, 1999 in Denver Colorado. <br /> <br />5) The participants of the ~eeting were in complete agreement that a site-specific study is the best <br />procedure for determini~g a PMP value for the Cherry Creek basin. <br /> <br />, <br /> <br />I <br /> <br />6) Much discussion took place regarding the performance of a non-Jederal technical review for <br />Cherry Creek basin or ~he negotiation of a joint non-federal and federal technical review. The <br />consensus was to attemp~ a joint review with the Corps of Engineers" <br /> <br />i 7) A recommendation was :made that the CWCB communicate with the Corps of Engim:ers to seek <br />an endorsement from them for a joint technical review. <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.