My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10400
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:41:07 PM
Creation date
8/2/2007 4:13:42 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Cherry Creek
Stream Name
Cherry Creek
Title
Meeting Announcement - Cherry Creek Dam Safety Study - Technical Meeting #4
Prepared For
Members and Invited Members of the Working Group
Prepared By
Larry Lang
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br />,~ <br /> <br />r <br /> <br />. Development of scope of work <br />. Funding <br />. Selection and management of contractor(s) <br />. Peer review by technical panel <br />. Corps and National Weather Service acceptance of site-specific analysis. <br />. Need for "Memorandum of Understanding." <br /> <br />, 8. Decision Items: . <br />. Should the CWCB staff request $5,000 for a three member technical panel to assist the "Working <br />Group" in drafting a "Scope-of-Work" for a joint Federal - State and local interest or a State and local <br />interest technical review study? <br />. What is the preferred study schedule and contractor? <br />. When do we engage in Congressional communications regarding specific study language for this <br />technical review? <br />. Next meeting schedule, location. <br />. Other. <br /> <br />cc: Peter Evans, Director, CWCB <br />Hal Simpson, State Engineer, DWR <br /> <br />l:\wctrans\seca\projects\cherry creek\meeting agenda 1-5-00.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.