<br />003193 <br /> <br />TASK 5--PRELIMINARY SCREENING OF ELEMENTS <br /> <br />The first part of this task will screen up to 10 alternative reservoir sites based on geo- <br />technical, environmental, and cost (dollars per acre-foot of yield) parameters and assist <br />in the screening down to 5 reservoir sites as identified in Task 4.C.5. This task will also <br />include preparation of conceptual layouts of the five selected reservoir sites and three <br />combination projects identIfied in Task 4.C. This task will involve formulating up to <br />three alternative project configurations, screening those alternatives, and, ultimately, <br />producing a recommended plan from those three alternatives. The recommended plan <br />is analyzed in Task 6. <br /> <br />This task will include the following activities: <br /> <br />· Task 5.A--Technical Considerations <br />· Task 5.B--Environmental Considerations <br />· Task 5.C..-Cost Considerations <br />· Task 5.D--Project Element Screening (Coordinate with 4.C.5) <br />· Task 5.E-Formulation of Alternative Concepts <br />· Task 5.F--Conceptual Project Hydrologic Analyses <br />· Task 5.G--Potential Environmental Impacts of Alternative Concepts <br />· Task 5.H--Alternative Concept Screening <br /> <br />TASK 5.A.. TECHl'\TJCAL CONSIDERATIONS <br /> <br />Purpose <br /> <br />The purpose of this subtask will be to assess technical considerations of the preliminary <br />list of 10 alternative reservoir sites identified during Task 2. Emphasis will be placed <br />on identifying geotechnical and technical issues affecting the feasibility of developing <br />reservoirs at the identified sites. This activity will run concurrently with the water avail- <br />ability and yield analysis tasks (Tasks 4.A and 4.B) and lead to the project team coordi- <br />nating the various discipline inputs in the screening process (Task 5.D). <br /> <br />Responsibility <br /> <br />CH2M HILL will be responsible for this task. <br /> <br />Approach <br /> <br />The study team's approach to this task will be to do the following: <br /> <br />1. Perform a site visit to each of the 10 preliminary sites recommended for funher <br />study as identified during Task 2. The site visit is scheduled during the 1990 fall <br />months and will be performed by a geologist, geOtechnical engineer, and a water <br /> <br />18 <br /> <br />DEN/BOOP/033.51 <br />