My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12592
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12592
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:42 PM
Creation date
8/2/2007 8:23:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.500.20
Description
CO River Operations-Accounting - Long Range Reservoir Operation-Annual Operations Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/24/1984
Author
Unknown
Title
1984 Reservoir Operations Study - Status Report - 08-24-84
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'" <br /> <br />002805 <br /> <br />e <br /> <br />e <br /> <br />Item 5 - Evaluate the Strategies <br /> <br />Target completion date - September 1, 1984. <br />85 percent complete - This item consists of running the CRSM, running the <br />output program, analyzing the output, making changes to the method and/or <br />computer code, and repeating the process. An initial review of the output <br />was made by members of the CRSS Technical Management Team and the Western <br />Area Power Admini stration and several refinements were made to the method <br />and computer code. Remaining work includes a final review of selected output <br />and then a complete set of computer runs using all depletion schedules and <br />hydrologic sequences. <br /> <br />Item 6 - Report the Results <br /> <br />Target completion date - draft: November 1, 1984 <br />final: February 1, 1985 <br />15 percent complete - This item includes writing the report, typing, reviews, <br />revisions, and publication. Approximately 50 percent of the initial writing <br />is complete. All other work remains to be done. <br /> <br />Status of Initial Report Writing <br /> <br />Section I - Overview <br /> <br />This section will provide general information about the study including its <br />background, purpose, objectives and methodology. Don Frevert is responsi ble <br />for completion of the section. It is currently about 60 percent complete. <br /> <br />Section II - Base Case Strategy <br /> <br />Thi s secti on wi 11 center on a di scus~ i on of the current operating or "base <br />case" strategy. Mike Cowan prepared a draft version of most of the section <br />and Don Frevent is responsible for its completion. This part is about <br />70 percent finished. <br /> <br />Section III - Alternative Strategies <br /> <br />This portion outlines alternative management strategies. The discussion covers <br />the desirable features of the strategies including continuous coverage of <br />the range of acceptable options, simplicity and easy identification and <br />description. Also, included is a description of the development and preliminary <br />evaluation of each strategy as well as a description of the modifications <br />to the CRSS model required to incorporate each strategy. Parts of this <br />di scussi on have been written by Bi 11 Lane and Mi ke Cowan. Don Frevert is <br />responsible for its completion. The section is approximately 70 percent <br />complete. <br /> <br />Section IV - Evaluation of Strategies <br /> <br />This part of the report covers the use of the CRSS model and various hydrologic <br />traces as a mechanism for evaluating the strategies and a review of input <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.