My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12584
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12584
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:16:40 PM
Creation date
8/1/2007 2:14:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.21
Description
Colorado River Basin Threatened and Endangered Species - UCRBRIP - Hatchery Facilities
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1992
Author
CWCB
Title
State of Colorado Hatchery Feasibility Study for Endangered Fishes of the Colorado River Basin - Edited Drafts-With Status of Study Tasks and Schedules - 09-01-92
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />09/11/92 <br /> <br />156 <br /> <br />001835 <br /> <br />URS CONSULTANT DENUER <br />:e <br /> <br />023 <br /> <br />ISSUES AND PERMITS <br /> <br />During the preparation of this study, technical and blologl~1 Issues have been ,raised <br />which affects the site evaluation and design process and ~ch must be considered as <br />the site selection Is made and the design of the recovery ~c1l1ty Is completed. These <br />Issues are briefly described below. An expanded descriptlpn of these issues can be <br />found In the full text of this study. I <br /> <br />Issues <br /> <br />The need for a hatchery and/or 8 research facilitY for the recovery of the <br />endangered fishes; , <br />The need and level of production for augmenta~lon a~d for research; <br />The role of the recovery facility for broodstock holding or refugia; <br />Determination of the numbers of genetically Indtvldu~1 subpopulatlons for each <br />speCies; ; . <br />Use and mix of IntensiVe and extensive fish culture te~hniques; <br />Type of hatchery water supply and the impact on fiS~ growth, health, genetics, <br />Imprinting, survivability in the wild, and hatchery caplt~1 and operation costs; <br />Hatchery location and proximity to native habitats; : <br />Role of the proposed hatChery and research faClIiW in the overall recovery <br />program; <br />Responsibility for construction of the hatchery and re~earch facility; <br />Responsibility for operation,of the hatchery and rese~rch facility; <br /> <br />Permits <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />In siting and constructing a hatchery or the .complete rec9very facility. a number of <br />permits from federal. state and local agencies will be requir~d. Given that the current <br />scope of the study is for a conceptual design and Is not bas~d on a specific site. it Is not <br />possible to determine the specific permits which would be req~ired for a specific site. The <br />following are descriptions of permits which could possibly ~e required and should be <br />evaluated for compliance as necessary. ! <br /> <br />· Environmental Assessment <br />Environmental Impact Statement <br />· Colorado NPDES permit <br />· Colorado wastewater discharge permit <br />Construction dewatering permit <br />· Corps of Engineers 404 Permit <br />· Zoning permit <br />· Building permits <br />· Water Rights <br />· Endangered Rsh Permit <br /> <br />~(~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.