My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Work Plan 2007 - Interbasin Compact Process.do
CWCB
>
IBCC Process Program Material
>
Backfile
>
Work Plan 2007 - Interbasin Compact Process.do
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:30 PM
Creation date
7/26/2007 10:54:18 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Work Plan 2007 - Interbasin Compact Process
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Needs Assessment working group’s initial task was to provide input to the State on <br />the selection of a contractor to provide technical assistance to the roundtables. With t his <br />accomplished the group assessed how they can assist the roundtables with their needs <br />assessments. The group will work closely with the State and the technical assistance <br />contractor and their relative roles are shown in Table 2. In addition to their r ole in the <br />technical assistance contract, the working group may address, what does “encourage <br />development of a common technical platform” really mean? The IBCC identified this <br />role in their Charter. The Needs Assessment working group would be the startin g place <br />for determining what a common technical platform would look like and how the IBCC <br />might promote or assure its development . <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.