My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO5 - eric edits
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO5 - eric edits
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:19:52 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-005
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Distribute Information through Water Education Groups <br /> <br />? <br />Leverage Comm unications through Partnerships <br /> <br />? <br /> Expand Outreach to Key Community Leaders <br /> <br />? <br /> Do a “Soft Launch” of the IBCC and Basin Roundtables <br /> <br />? <br /> IBCC Website <br /> <br />? <br /> IBCC Newsletter <br /> <br />? <br />External speakers bureau <br /> <br />? <br /> Internal speakers bureau <br /> <br />? <br /> Town hall pilot program <br /> <br />? <br /> High School curricu lum <br /> <br />? <br /> Issues Management <br /> <br />? <br /> Consider Establishing a Basin Communications Lead <br /> <br />? <br /> <br />Task 4 Common Technical Platform <br />Based on information produced in Task 1, the Consultant will work with CWCB to encourage, <br />foster and maintain a common technical platform. This will include working with CWCB to <br />make sure that information can be included with CWCB standard databases and tools such as <br />the Decision Support System , the Water Resource Information Center , and CWCB/DNR <br />Deleted: and <br /> <br />websites . <br />Task 5 Attendance at IBCC and Basin Round table Meetings, <br />Project Management, Coordination, and Administration <br />Project management assistance will include Consultant's Project Director, Technical Director or <br />Task Order Manager, and Basin Advisor attendance at quarterly Basin Roundtable m eetings for <br />Deleted: will attend <br />all basins until June 30, 2008. <br />The Consultant will provided support to the DNR State Project Manger for coordination and <br />administration of the IBCC and Basin Roundtable meetings such as: <br />Support to the DNR State Project Manager for planning an d running IBCC meetings as <br /> <br />? <br />needed <br />Developing action items from Basin Roundtable meetings <br /> <br />? <br />Reproduction of presentation material <br /> <br />? <br />Posting of material to the website <br /> <br />? <br />Weekly coordination meeting with the project manager <br /> <br />? <br />Coordination with Basin Roundtable Chair s <br /> <br />? <br />Coordination with Colorado Water Conservation Board (CWCB) <br /> <br />? <br />The Consultant will incorporate action items into a working Tracking Matrix for each Basin <br />Roundtable. The Consultant will also, as appropriate, incorporate deliverables into a working <br />Needs Ass essment for each Basin Roundtable based on their previously prepared Basin Report. <br />Formatted: Bullets and Numbering <br />
The URL can be used to link to this page
Your browser does not support the video tag.