Laserfiche WebLink
<br />capture the wide variety of conditions, as appropriate (e.g., during the drought <br />of 2002 - 2004). The Consultant will meet with Crested Butte Mountain Resort to <br />assess their estimates for future snowmaking. The results of this meeting will be <br />reflected in the Technical Memorandum created for Task 1. <br /> <br />Deliverable: Incorporation of tl1e results of tl1is task into Draft and Final Tecll11icnl <br />Memorandums created for Tasks 1 and 2. <br /> <br />For all four tasks, the Consultant will consider the data collection and analysis <br />efforts in light of the need to establish a common technical platform for these <br />activities. The planning horizon, the data used for population projects, and water <br />use levels will be consistent with other Basin's. <br /> <br />Associated fee: $35,000 <br /> <br />1.5 Metro Basin Roundtable <br />Summary of Metro Basin Roundtable Request <br />The Metro Basin Roundtable has requested that a work plan be completed for the <br />following tasks: <br />1) Updating the status of identified projects and processes from SWSI <br />2) Further articulate what the Metro Basin water users are implementing <br />regarding conservation and reuse <br />3) Completing the 10,285 study <br />4) Identify potential fallowing arrangements <br />5) Underground storage (aquifer storage and recovery) options in the basin <br /> <br />Metro Basin Roundtable Tasks Authorized under Task Order 2007-003 <br />The Consultant will meet with needs assessment subcommittee two times in <br />person and two times via conference call during March 2007 through June 30, <br />2007 to define what elements need to be contained in their work plan. The <br />Consultant will develop draft sections of the work plan based on these input <br />from these meetings. The Consultant will use information from SWSI 2 to <br />address work plan element 2 above. For all work plan elements, a common <br />technical platform will be considered by the Consultant. <br /> <br />Deliverable: Draft and final work plan addressing the roundtable's 5 elements <br />outlined above. <br />Associated fee: $35,000 <br /> <br />1.6 North Platte Basin Roundtable <br />Summary of North Platte Basin Roundtable Request <br />The North Platte Basin Roundtable has requested that a work plan be developed <br />to address the following items: <br />