Laserfiche WebLink
<br />Due to funding limitations between March and June 30,2007, the Consultant will <br />not address the basin's consumptive needs during this time. The work plan to <br />address consumptive needs will be addressed after June 30,2007. <br /> <br />Deliverables: 1) Draft and Final Work plan for addressing non-consumptive <br />needs; 2) Initial sections of a work plan for energy needs. <br /> <br />Associated fee: $35,000 <br /> <br />1.3 Dolores/San Juan/San Miguel (Southwest) Basin Roundtable <br />Summary of Dolores/San Juan/San Miguel (Southwest) Basin Roundtable <br />Request <br />To further their needs assessment the Dolores/San Juan/San Miguel (Southwest) <br />Basin Roundtable has requested a task order to develop a work plan to address <br />the following: <br /> <br />1) Consumptive use assessment - review consumptive use needs from SWSI and <br />update based on more recent information such as evaluating additional Colorado <br />River depletions. <br /> <br />2) Non-consumptive use assessment - build upon efforts from SWSI Phase 2 to <br />develop assessment of needs for the basin. <br />3) Alternatives to permanent agriculture dry-up - identify opportunities for <br />alternatives to permanent transfers from irrigated agriculture to M&I uses. <br /> <br />4) Analysis and options for water conservation and efficiency - identify <br />possibilities and methods for identifying yields from conservation and efficiency <br />throughout the basin. <br /> <br />Dolores/San Juan/San Miguel (Southwest) Basin Roundtable Tasks <br />Authorized under Task Order 2007-003 <br />The Consultant will meet with needs assessment subcommittee two times in <br />person and two times via conference call during March 2007 through June 30, <br />2007 to define what elements need to be contained in their work plan. The <br />Consultant will develop draft sections of the work plan based on these input <br />from these meetings. The Consultant will use information from SWSI 2 to <br />address work plan elements 2, 3 and 4 above. In addition, the work plan for non- <br />consumptive needs developed in the Colorado Basin should be considered for <br />the Dolores/San Juan/San Miguel (Southwest) Basin. For all work plan elements, <br />a common technical platform will be considered by the Consultant. <br /> <br />Deliverable: Draft and Final Work plan addressing the roundtable's 4 elements <br />outlined above. <br />Associated fee: $35,000 <br />