Laserfiche WebLink
<br />1) Non-consumptive needs - develop statewide standard method for developing <br />non-consumptive needs assessment and customize for the Colorado Basin. <br /> <br />2) Consumptive use needs - develop a work plan to evaluate future projects to <br />address Colorado Basin's 62,000 AF gap identified in SWSI. <br /> <br />3) Energy needs - develop a work plan to execute the joint Colorado and <br />Yampa/White roundtables energy study. <br /> <br />Colorado Basin Roundtable Tasks Authorized under Task Order 2007-003 <br />The Consultant will meet with the non-consumptive needs assessment <br />committee three times between March 2007 and June 30, 2007 to discuss progress <br />on the work plan for the non-consumptive needs assessment. One of these <br />meetings will include a workshop with statewide environmental and recreational <br />interests. The goal is to produce a draft work plan by April 30, 2007 so that the <br />Colorado Basin Roundtable can plan for funding further non-consumptive needs <br />studies through HB06-1400, SB06-179, or other funding mechanisms. The work <br />plan will contain the following elements: <br /> <br />. Task 1: Definition of Non-Consumptive Needs/Values <br />. Task 2: Identification of Critical Stream Reaches and associated values <br />. Task 3: Identification of methods for the Quantification of Needs <br />. Task 4: Cost Estimates <br />. Task 5: Meetings with Non-Consumptive Needs Assessment Subcommittee and <br />BRT <br /> <br />The work plan will be structured so that study elements are considered in two or <br />more phases. The first phase will be consideration of the above tasks that can be <br />completed with existing data. Subsequent phases will focus on addressing data <br />gaps such as data collection needs and further refinement of non-consumptive <br />needs. This work plan development will be consistent with development of work <br />plans for non-consumptive needs throughout all the basins as a common <br />technical platform needs to be maintained for evaluating non-consumptive <br />needs. <br /> <br />In addition to the non-consumptive needs work plan, the Consultant will <br />prepare initial sections of a work plan document for conducting the Energy <br />needs study. The Consultant will meet with the Energy needs subcommittee once <br />during March through June 30, 2007 to discuss further completion of this work <br />plan. <br />