Laserfiche WebLink
The study will assess the technical feasibility of alternative sediment management <br />techniques and identify the most economical and practical technique(s) for long - term <br />sediment management. The intent is to establish a solid technical and regulatory basis <br />on which to make decisions regarding future goa ls such as construction of sedimentation <br />control features, removal of existing sediment, improvements in the drainage basin, <br />operation and maintenance protocols and future sedimentation monitoring. <br /> <br /> <br /> <br />Summary <br /> <br />Committed SB 06 - 179 Funds <br />GBRT <br /> <br /> <br />2007 <br />Project Date Basin Acct Balance State Acct App’d Disapp’d <br /> $500,000 <br />P7/UVWUA 5/7 56,700 <br />Water Storage <br />NFRIA 5/7 48,000 $62,700 <br />Ditch Rehab <br />NFWIA/FMCRC 5/7 79,000 230,000 <br />Paonia Res Sed <br />144,500 <br />Overland Ditch & 4/2 <br />Pending <br />Res. Co. <br />Orchard City 2/23 60,000 480,000 3/5 <br />Water Res. <br />Leroux Creek 2/23 60,000 3/5 <br />Lake San 2/23 35,000 3/5 <br />Cristobal <br /> $161,300 $917,200 <br /> <br /> <br /> <br />Objective <br /> <br /> <br /> <br /> <br /> <br />Page 3 of 3 <br />GBRT - PSC Recommendations <br />7 May 2007 <br /> <br />