Laserfiche WebLink
In connection with the request, the roundtable is recommended t o ask for cost estimates for <br />the five HB1400 tasks listed above to be prepared by the technical assistance team as soon as <br />possible. If it is determined that the cost estimates for these tasks (plus any others) total more <br />than the estimated $35,000 availab le on July 1, the roundtable may want to submit (with a <br />qualified sponsor) a grant application, using SB179 basin account funds, to complete the <br />tasks during the 2007 - 2008 fiscal year. Otherwise, the tasks won't be started until after July <br />2008. <br /> <br /> <br />3/28/07 2 <br /> <br />