<br />u01719 <br /> <br />Long Hollow Dam and Reservoir Summary Report-Preliminary Draft <br /> <br />anticipated in Phase II. +/- 20% if constructed within 5-years. what is the normal standard <br />and assumptions?) (How can LPWCD meet costs greater than that provided by the <br />escrowed funds and what is LPWCD capability to do so.) <br /> <br />The LHR OM&R expenses will be derived from a water user fee of approximately <br />$15/AF. (Are the beneficiaries willing to pay this? <br /> <br />In summary, based on the work performed for the LHR Phase I feasibility study, there are <br />no apparent fatal flaws that would make the LHR project infeasible at this level of study. <br /> <br />E:\Documents\Wwe Wei\2004\991-077\080-110\Task 5\Sumrnary Report\Summary Report Red Dot\Report 5-24-04.doc <br /> <br />991-077.115 <br />May 2004 <br /> <br />Wright Water Engineers, Inc. <br /> <br />Page 20 <br />